Nissan Juke F15. Instruction — part 628
EM-66
< UNIT REMOVAL AND INSTALLATION >
[MR FOR NISMO RS MODELS]
ENGINE ASSEMBLY
1. Use a instruction lift table caddy (commercial service tool) (A) or
equivalently rigid tool such as a transmission jack. Securely sup-
port bottom of the engine and the transaxle assembly.
CAUTION:
Put a piece of wood or an equivalent as the supporting sur-
face, secure a completely stable condition.
2. Remove upper torque rod (RH) (1), and engine mounting insula-
tor (RH) (2).
3. Remove engine mounting insulator (LH). (CVT models)
4. Remove the through bolt-securing nut (B) of engine mounting
bracket (LH). (M/T models)
5. Carefully lower jack, or raise lift to remove the engine and the transaxle assembly. When performing work,
observe the following caution.
CAUTION:
• Check that no part interferes with the vehicle side.
• Before and during this lifting, always check if any harnesses are left connected.
• During the removal, always be careful to prevent the vehicle from falling off the lift due to
changes in the center of gravity.
• If necessary, support the vehicle by setting jack or suitable tool at the rear.
Separation
1. Remove catalyst convertor. Refer to
.
2. Remove turbocharger. Refer to
3. Remove exhaust manifold. Refer to
.
PBIC3223J
: Vehicle front
JPBIA4419ZZ
1
: Engine mounting insulator (LH)
2
: Engine mounting frame support (LH)
A
: Through bolt
: Vehicle front
JPBIA4421ZZ
ENGINE ASSEMBLY
EM-67
< UNIT REMOVAL AND INSTALLATION >
[MR FOR NISMO RS MODELS]
C
D
E
F
G
H
I
J
K
L
M
A
EM
N
P
O
4. Install engine slinger to front cover front left side (A) and cylinder
head rear right side (B).
5. Remove starter motor. Refer to
STR-28, "MR16DDT : Removal and Installation"
.
6. Lift with a hoist and separate the engine from the transaxle assembly. Refer to
.
INSTALLATION
Note the following, and install in the reverse order of removal.
CAUTION:
• Never allow engine oil to get on engine mounting insulator. Be careful not to damage engine mount-
ing insulator.
• Check that each mounting insulator is seated properly, and tighten mounting nuts and bolts.
• When installation directions are specified, install parts according to the direction marks on them
referring to the figure of components. Refer to
Rear torque rod bracket
1. Temporarily tighten mounting bolts in the numerical order as
shown in the figure.
2. Tighten mounting bolts to the specified torque in the numerical
order as shown in the figure.
2WD : Inspection
INFOID:0000000012197284
INSPECTION AFTER INSTALLATION
Inspection for Leakage
The following are procedures for checking fluids leakage, lubricates leakage, and exhaust gases leakage.
• Before starting engine, check oil/fluid levels including engine coolant and engine oil. If less than required
quantity, fill to the specified level. Refer to
MA-11, "Fluids and Lubricants"
• Use procedure below to check for fuel leakage.
- Turn ignition switch “ON” (with engine stopped). With fuel pressure applied to fuel piping, check for fuel leak-
age at connection points.
- Start engine. With engine speed increased, check again for fuel leakage at connection points.
• Run engine to check for unusual noise and vibration.
• Warm up engine thoroughly to check there is no leakage of fuel, exhaust gases, or any oil/fluids including
engine oil and engine coolant.
• Bleed air from lines and hoses of applicable lines, such as in cooling system.
• After cooling down engine, again check oil/fluid levels including engine oil and engine coolant. Refill to the
specified level, if necessary.
Summary of the inspection items:
: Engine front
Slinger bolts
Front cover front left
side:
: 32.9 N·m (3.4 kg-m, 24 ft-lb)
Cylinder head rear
right side:
: 25.0 N·m (2.6 kg-m, 18 ft-lb)
JPBIA4422ZZ
: Vehicle front
JPBIA4416ZZ
Items
Before starting engine
Engine running
After engine stopped
Engine coolant
Level
Leakage
Level
EM-68
< UNIT REMOVAL AND INSTALLATION >
[MR FOR NISMO RS MODELS]
ENGINE ASSEMBLY
*: Power steering fluid, brake fluid, etc.
AWD
AWD : Exploded View
INFOID:0000000012197285
AWD : Removal and Installation
INFOID:0000000012197286
WARNING:
Engine oil
Level
Leakage
Level
Transmission /
transaxle fluid
AT & CVT Models
Leakage
Level / Leakage
Leakage
MT Models
Level / Leakage
Leakage
Level / Leakage
Other oils and fluids*
Level
Leakage
Level
Fuel
Leakage
Leakage
Leakage
Exhaust gases
—
Leakage
—
1.
Washer
2.
Upper torque rod (RH)
3.
Engine mounting insulator (RH)
4.
Rear engine mounting bracket
5.
Rear torque rod
6.
Engine mounting insulator (LH)
: N·m (kg-m, ft-lb)
: Always replace after every disassembly.
JPBIA4318GB
ENGINE ASSEMBLY
EM-69
< UNIT REMOVAL AND INSTALLATION >
[MR FOR NISMO RS MODELS]
C
D
E
F
G
H
I
J
K
L
M
A
EM
N
P
O
• Situate the vehicle on a flat and solid surface.
• Place chocks at front and back of rear wheels.
• Attach proper slingers and bolts described in PARTS CATALOG if engine slingers are not equipped.
CAUTION:
• Always be careful to work safely, avoid forceful or uninstructed operations.
• Never start working until exhaust system and coolant are cool enough.
• If items or work required are not covered by the engine section, refer to the applicable sections.
• Always use the support point specified for lifting.
• Use either 2-pole lift type or separate type lift as best you can. If board-on type is used for unavoid-
able reasons, support at the rear axle jacking point with a transmission jack or similar tool before
starting work, in preparation for the backward shift of center of gravity.
• For supporting points for lifting and jacking point at rear axle, refer to
NOTE:
When removing components such as hoses, tubes/lines, etc., cap or plug openings to prevent fluid from spill-
ing.
REMOVAL
Outline
Remove the engine and the transaxle assembly from the vehicle downward. Separate the engine and the tran-
saxle.
Preparation
1. Release fuel pressure. Refer to
2. Drain engine coolant from radiator. Refer to
CAUTION:
• Perform this step when the engine is cold.
• Never spill engine coolant on drive belts.
3. Remove the following parts.
• Engine undercover
• Front road wheels and tires
• Front fender protector (RH and LH): Refer to
• Drive belt: Refer to
EM-20, "Removal and Installation"
• Engine cover: Refer to
• Battery and battery tray: Refer to
.
• Air duct, air cleaner case assembly and air cleaner body assembly: Refer to
.
• Radiator hose (upper and lower): Refer to
.
• Radiator cooling fan assembly: Refer to
• Exhaust front tube: Refer to
.
• Alternator: Refer to
CHG-33, "MR16DDT : Removal and Installation"
.
Engine Room LH
1. Disconnect all connections of engine harness around the battery, and then temporarily secure the engine
harness into the engine side.
CAUTION:
Protect connectors using a resin bag against foreign materials during the operation.
2. Disconnect fuel feed hose quick connector. Refer to
3. Disconnect heater hoses. Refer to
.
4. Disconnect control cable from transaxle. Refer to
.
5. Remove EVAP hoses. Refer to
.
Engine Room RH
1. Disconnect vacuum hose from intake manifold. Refer to
.
2. Remove A/C compressor. Refer to
.
3. Remove ground cable at engine side.
Vehicle Underbody
1. Remove ground cable at transaxle side.
2. Remove rear propeller shaft. Refer to
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст