Chrysler Crossfire. Manual — part 142

INSTALLATION

INSTALLATION

1. Position the idler pulley (2) on the engine.

2. Install the idler pulley bolt (1). Tighten to 20 N·m

(15 ft. lbs.).

3. Install the bolt cover (1) on the idler pulley.

ZH

ACCESSORY DRIVE

7 - 103

Note: If a dowel rod was inserted into the acces-
sory drive belt tensioner, remove rod.

4. Rotate the belt tensioner counterclockwise and

install the accessory drive belt over the idler pulley.

5. Carefully release the belt tensioner and remove the

wrench.

6. Install and properly route the accessory drive belt.

(Refer to 7 - COOLING/ACCESSORY DRIVE -
OPERATION).

7 - 104

ACCESSORY DRIVE

ZH

INSTALLATION - IDLER PULLEY (SRT)

1. Position the idler pulley on the engine.

2. Install the idler pulley bolt (1). Tighten the idler pul-

ley bolt to 20 N·m (15 ft. lbs.).

3. Rotate the belt tensioner counterclockwise and

install the accessory drive belt over the idler pulley.

Note: If a dowel rod was inserted into the acces-
sory drive belt tensioner, remove rod.

4. Carefully release the belt tensioner and remove the

wrench.

ZH

ACCESSORY DRIVE

7 - 105

5. Install and properly route the accessory drive belt.

(Refer to 7 - COOLING/ACCESSORY DRIVE -
OPERATION).

INSTALLATION - SUPERCHARGER IDLER (SRT)

1. Install the supercharger idler pulley retainer bolts

(1) and (2), and the pulley assembly. Tighten bolts
to 20 N·m (15 ft. lbs.).

2. Install the accessory drive belt.

7 - 106

ACCESSORY DRIVE

ZH

Была ли эта страница вам полезна?
Да!Нет
9 посетителей считают эту страницу полезной.
Большое спасибо!
Ваше мнение очень важно для нас.

Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.

Текст

Политика конфиденциальности