SsangYong Korando II (1996-2006 year). Manual — part 359
TRANSFER CASE (PART TIME - 4408) 5D2-35
SSANGYONG MY2002
KAA5D750
KAA5D760
KAA5D770
ASSEMBLY PROCEDURE
•
Use special tools during assembly of oil seals and
bearings.
•
Lubricate bearings, oil seals and bushings before
assembly.
Transfer Case Assembly
1. If the ring gear was removed, align the outer
diameter of the new replaced ring gear with transfer
case and assemble it.
2. Insert the pin.
3. Insert the ball bearing to the case and install the
retaining ring.
4. Install the new oil seal by pressing into the case.
5. Make sure that all parts are correctly and firmly
installed into the case.
Electric Shift Cam Parts
1. Insert the spacer into torsion spring.
2. Insert the end of the shift shaft into the spacer
smoothly.
SSANGYONG MY2002
5D2-36 TRANSFER CASE (PART TIME - 4408)
KAA5D780
KAA5D790
KAA5D800
3. Slide the torsion spring and spacer to the left of
the shift shaft and position the end of the first
spring to fix on the drive tang.
4. Push the end of the second spring to right and fix
it on the drive tang.
5. Push the torsion spring and spacer together back
them completely.
6. Slide the electric shift cam onto the shift shaft.
7. Install the electric shift cam assembly into the
transfer case after installation of the shift fork.
TRANSFER CASE (PART TIME - 4408) 5D2-37
SSANGYONG MY2002
KAA5D810
KAA5D820
Adapter, Input Shaft and Carrier
1. Place the planet carrier assembly on work bench
to be the retaining ring mounting groove upward.
2. Install the sun gear with the hub end up into the
planet carrier assembly and rotate the sun gear
to make sure that gears are fully engaged.
3. Align the tabs and install the thrust plate into the
planet carrier assembly.
4. Install the retaining ring to the planet carrier
assembly.
5. Press the needle bearing into the input shaft and
press the new sleeve bearing into the input shaft
assembly.
6. Install the planet carrier assembly onto the input
shaft and install the thrust washer. Press the
bearing over input shaft.
7. After pressing the bearing, install the retaining
ring.
8. Press the pin into the front adapter.
9. Slowly press the oil seal into the front adapter.
10. Install the front adapter assembly.
Notice: After installation, make sure that snap ring
is correctly installed into the groove.
11. Position the input shaft assembly over front cover
and engage into the bearing groove by expanding
the ends of snap ring.
12. Apply 1.6mm bead of sealant on the mounting
face for the transfer case and tighten the 6 bolts.
13. Install the breather.
Installation Notice
Tightening Torque
28 - 40 N•m
(21 - 30 lb-ft)
4 - 7 N•m
(35 - 62 lb-in)
Item
6 Bolts
Breather
Front Output Shaft
Cross Sectional View
SSANGYONG MY2002
5D2-38 TRANSFER CASE (PART TIME - 4408)
KAA5D830
KAA5D840
KAA5D850
Input Shaft
Cross Sectional View
Tightening Torque
346 - 380 N•m
Front Output Shaft
1. Install the deflector on the yoke.
2. Position the output shaft in transfer case and install
the companion flange assembly, oil seal, washer
and nut.
3. Holding the companion flange, tighten the nut.
Installation Notice
Reduction Shift Parts
1. Install the new pin, roller and retainer into the
reduction shift fork.
2. Press the pin, roller and retainer into the reduction
spilt fork bore completely.
Notice: Make sure that the cam roller turns freely.
3. Install the 2 fork facing on the reduction shift fork
assembly.
4. Install the reduction shift fork onto the previously
installed reduction hub in the transfer case.
5. Install the output shaft spline into the reduction
hub and engage the output shaft end with input
shaft bearing.
Notice: For installation of the output shaft,
assemble the oil pump temporarily.
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст