SsangYong Korando II (1996-2006 year). Manual — part 40
1E1 -- 6 M162 ENGINE ELECTRICAL
DAEWOO MY_2000
SPARK PLUG
Preceding Work: Removal of intake air duct
1 Spark Plug Cover
2 Bolt (M6 X 60, 7 pieces)
9--11 NSm (80--97 lb-in)
. . . . . . . . . . . . . . . . . . . . .
3 Spark Plug
T1/1Ignition Coil : Cylinder 2 and 5
T1/2Ignition Coil : Cylinder 3 and 4
T1/3Ignition Coil : Cylinder 1 and 6
M162 ENGINE ELECTRICAL 1E1 -- 7
DAEWOO MY_2000
Replacement Procedure
1. Remove the seven bolts (2) and remove the spark
plug cover.
Installation Notice
Tightening Torque
9 -- 11 NSm (80 -- 97 lb-in)
2. Remove the two bolts (M6 X 25) from each ignition
cable and remove the ignition cable.
Installation Notice
Tightening Torque
9 -- 11 NSm (80 -- 97 lb-in)
3. Remove the spark plug.
Installation Notice
Tightening Torque
20 -- 30 NSm (15 -- 22 lb-ft)
1E1 -- 8 M162 ENGINE ELECTRICAL
DAEWOO MY_2000
IGNITION CABLE
Preceding Work: Removal of intake air duct
1 Control Cable Connection
2 Ignition Cable
3 Spark Plug Connector
4 Coupling Plug
5a, 5b Secondary Voltage Connection
E Iron Core
L1 Secondary Ignition Coil
L2 Primary Ignition Coil
M162 ENGINE ELECTRICAL 1E1 -- 9
DAEWOO MY_2000
Functions
1. Firing order : 1--5--3--6--2--4
2. The ignition cables are located on the cylinder head
cover. Each ignition coil provides the high voltage to
two spark plugs simultaneously.
-- T1/1 : cylinder 2 and 5
-- T1/2 : cylinder 3 and 4
-- T1/3 : cylinder 1 and 6
3. The secondary output voltage (5a) is supplied to the
No.2 cylinder spark plug through the spark plug con-
nector. The secondary output voltage (5b) is supplied
to the No.5 cylinder spark plug through the ignition
cable. The guide pin (W) acts as a ground while the
ignition cable is operated.
Removal & Installation Procedure
1. Disconnect the negative battery cable (1).
2. Remove the ignition cable connector from the ignition
cable.
3. Disconnect the secondary spark plug connectors
from the each spark plugs and remove the ignition
cable bolt and ignition cable.
Installation Notice
Tightening Torque
9 -- 11 NSm (80 -- 97 lb-in)
D
Make sure that the ignition cables are correctly
routed.
D
Exactly install the ignition cable guide pin into the
vehicle to be grounded.
4. Installation should follow the removal procedure in
the reverse order.
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст