SsangYong Musso. Manual — part 397
1B3-150 OM600 ENGINE MECHANICAL
In this position, the marking on camshaft / camshaft bearing
cap (arrow) must also be aligned. If the markings are not
aligned, the timing chain must be re-set and the injection
pump timing has to be set.
14. Position the no.1 cylinder at TDC.
11. Place the fitting tool (8) onto the chain link and rivet the
chain pins one by one.
12. Check the riveting of chain pins and re-rivet if necessary.
13. Remove the wire.
Tightening Torque
35 - 40 Nm
OM600 ENGINE MECHANICAL 1B3-151
TENSIONING RAIL
Preceding Work : Removal of cylinder head
Removal of timing case cover
1 Tensioning Rail
2 Bearing Pin
Notice
The plastic coating of the tensioning rail can not be replaced.
1B3-152 OM600 ENGINE MECHANICAL
CYLINDER HEAD GUIDE RAIL
Preceding Work : Removal of the cooling fan
Removal of poly V-belt
Removal of chain tensioner
1 Cylinder Head Cover
2 Bolt . . . . . . . . . . . . . . . 10Nm
3 Gasket . . . . . . . . . . . . ... Replace
4 Camshaft Sprocket
5 Washer
6 12-Sided Bolt (M11) . . . Inspect, 25Nm + 90°
7 Tensioning Lever
8 Bolt . . . . . . . . . . . . . . . 23Nm
9 Bearing Pin . . . . . . ... Sealing Compound
10 Guide Rail
11 Bearing Pin
12 Guide Pulley
13 Socket Bolt . . . . . . . . . . . . 23Nm
14 Closing Cover
15 Spring
16 Timing Chain
OM600 ENGINE MECHANICAL 1B3-153
Tools Required
115 589 02 34 00 Sliding Hammer
116 589 20 33 00 Threaded Pin
Removal Procedure
1. Removal the cylinder head cover.
2. Pull off the tensioning lever (7) and remove from the spring
(15).
3. Pry off the closing cover (14) and remove the bolt (13) and
then remove the guide pulley (12).
4. Place alignment marks (arrow) on the timing chain (16) and
camshaft sprocket (4).
5. Remove the camshaft sprocket.
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст