Isuzu D-Max / Isuzu Rodeo (TFR/TFS). Manual — part 595
FUEL SYSTEM 6C – 39
INSPECTION AND ADJUSTMENT (AFTER
DISASSEMBLY)
Adjustment of nozzle opening pressure, inspection for
leakage and spray condition should be explained.
Adjustment of nozzle opening pressure
Install injection nozzle and nozzle holder assembly to
nozzle tester.
Adjust the nozzle opening pressure by setting pressure
adjusting shim until desired pressure is obtained.
Check nozzle openinig pressure by pumping tester lever
once per second.
Nozzle opening pressure can be changed by:
1. Change of adjusting shim thickness at the rate of 4.8
kg/cm2 (68.3 psi/470.9 kpa) every thickness change
of adjusting shim by 0.04 mm (0.0016 in.).
2. Adding one 0.05 mm shim to increase 6 kg/cm
2
(85.3
psi/588.6 kpa).
Nozzle opening pressure of injection nozzles:
150 kg/cm
2
(2,133 psi/14.7 MPa)
Adjusting shims used for injection nozzle assembly.
Adjusting Shim Available
mm (in)
SHIM THICKNESS
IDENTIFICATION
MARK ON SHIM
0.50
(0.0197)
0.54 (0.0213)
↓
0.94 (0.0370)
0.98 (0.0386)
1.00 (0.0394)
0.05 (0.0020)
50
54
↓
94
98
00
NONE
6C – 40 FUEL SYSTEM
INJECTION NOZZLE
(For 4JA1TC, 4JH1TC Engine)
DISASSEMBLY
080L200009
Disassembly Steps
1.
Retaining nut
9.
Collar
2.
Nozzle & pin
10.
Spring seat
3.
Spacer & pin
11.
First spring
4.
Lift Piece
12.
Shim (First nozzle opening
pressure adjustment)
5.
Spring seat
13.
Nozzle holder body
6.
Push rod
14.
Eye bolt
7.
Shim (Second nozzle opening
pressure adjustment)
15.
Gasket
8.
Second spring
Important Operations
The two-spring nozzle holder has been developed to
reduce NOx (Nitrogen Oxides) and particulates from direct
injection diesel enigne exhaust.
Before disassembly remove carbon deposit from nozzle
and nozzle holder using a wire brush and wash the outside
nozzle holder assembly.
Caution:
Do not touch nozzle holes with the wire brush during
cleaning it.
Disassemble the nozzle holder assembly to numerical
order.
FUEL SYSTEM 6C – 41
REASSEMBLY
080L200010
Reassembly Steps
1.
Nozzle holder body
9.
Spring seat
2.
Shim (First opening pressure
adjustment)
10.
Lift Piece
3.
First spring
11.
Spacer & pin
4.
Spring seat
12.
Nozzle & pin
5.
Collar
13.
Retaining nut
6.
Second spring
14.
Gasket
7.
Push rod
15.
Eye bolt
8.
Shim (Second opening pressure
adjustment)
Important Operations
The nozzle holder is adjusted as the components are
reassembled in the sequence above.
As adjustment of the two-spring nozzle holder is made in
hundredths of a millimeter, clean the parts thoroughly in
light oil to completely remove any dirt or foreign matter.
6C – 42 FUEL SYSTEM
REASSEMBLY AND ADJUSTMENT PROCEDURE
1
First nozzle opening pressure adjustment
Adjust the first nozzle opening pressure using the shim.
2
Full needle valve lift confirmation
Confirm the full needle valve lift in accordance with the
closed method.
3
Pre-lift confirmation
Confirm pre-lift in accordance with the closed method.
CAUTION:
If not as specified, replace the nozzle assembly, lift
piece, pins and spacer using the nozzle service kit.
4
Second nozzle opening pressure
confirmation
Confirm the second nozzle opening pressure in accordance
with the closed method.
5
Second nozzle opening pressure
adjustment
Adjust the second nozzle opening pressure using the shim.
6
Final inspection
Confirm the condition of the fuel spray with the nozzle and
nozzle holder assembled.
First nozzle opening pressure adjustment
Nozzle needle valve full-lift
0.25 mm (0.0098 in)
Nozzle needle valve pre-lift
0.04 mm(0.0016 in) at 204 kg/cm
2
(2901 psi, 20,000 kpa)
Nozzle pressure 1st Stage
4JA1TC : 199−209 kg/cm
2
(2830−2972 psi, 19.5−20.5 Mpa)
4JH1TC : 204−214 kg/cm
2
(2901−3043 psi, 20.0−21.0 Mpa)
2nd Stage
4JA1TC : 347−362 kg/cm
2
(4934−5148 psi, 34.0−35.5 Mpa)
4JH1TC : 350−365 kg/cm
2
(4977−5190 psi, 34.3−35.8 Mpa)
at lift 0.09 mm (0.0035 in)
= (pre lift + 0.05 mm (0.0020 in))