Isuzu KB P190. Manual — part 226
ENGINE MECHANICAL 6A – 99
POSITIVE CRANKCASE VENTILATION (PCV) VALVE
RTW46AMF000101
Reassembly Steps
1.
Positive Crankcase Ventilation
(PCV) Valve
5.
Fixing bolt
2.
Rubber space
6.
Oil filler cap
3.
Cylinder head insulator cover
4.
Breather pipe
6A – 100 ENGINE MECHANICAL
Reassembly
1. PCV
Valve
Install the PCV valve and tighten the bolts to specified
torque.
PCV Valve Bolts Torque
N·m(kg·m/lb in)
2 (0.2/17)
2. Rubber
Spacer
3. Cylinder Head Insulator Cover
RTW36ASH001401
4. Breather
Hose
Apply LOCTITE 262 or equivalent to the new breather pipe.
Do not reuse the breather pipe.
5. Fixing
Bolt
Fixing Bolt Torque
N·m(kg·m/lb in)
19 (1.9/14)
6. Oil Filler Cap
010R100014
ENGINE MECHANICAL 6A – 101
MAJOR COMPONENT
Reassembly Steps-1
1.
Cylinder body
10.
Camshaft timing gear
2.
Tappet
11.
Piston and connecting rod with
upper bearing
3.
Crankshaft upper bearing
12.
Connecting rod bearing cap with
lower bearing
4.
Crankshaft
13.
Piston cooling oil pipe
5.
Crankshaft thrust bearing
14.
Oil pump with oil pipe
6.
Crankshaft bearing cap with
lower bearing
15.
Crankshaft rear oil seal
7.
Camshaft
16.
Crank case
8.
Timing gear case
17.
Cylinder body rear plate
9.
Camshaft thrust plate
18.
Flywheel
014R300004
6A – 102 ENGINE MECHANICAL
RTW46ALF000501
Reassembly Steps-2
19.
Crankshaft timing gear
23.
Injection pump
20.
Idler gear shaft
24.
Water pump
21.
Idler gear "A"
25.
Timing gear case cover
22.
Idler gear "B" and shaft
26.
Crankshaft damper pulley
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст