Isuzu KB P190. Manual — part 1122
UNIT REPAIR (JR405E) 7A4-11
CONTROL VALVE ASSEMBLY
01CV40
Disassembly steps
1. Oil strainer
Remove the 13 bolts and the oil strainer from the control
valve assembly.
02CV26
2. Harness assembly
Remove the harness assembly.
04CV21
3. Solenoid fixing plate
4. Harness bracket
• Remove the 11 bolts and the solenoid fixing plate
together with the harness bracket.
05CV20
7A4-12 UNIT REPAIR (JR405E)
06CV19
5. Solenoid
6. Oil pressure switch
Remove the 6 solenoids together and the 3 oil pressure
switches.
07CV17
7. Control valve upper body
8. Control valve lower body
9. Separation plate
• Remove the 17 bolts securing the control valve upper
body, the control valve lower body, and the separation
plate.
08CV16
• Separate the upper body, the lower body, and the
separation plate.
NOTE:
Take care not to drop or lose the parts at the inside of the
control valve.
Inspection
• Inspect the separation plate for wear and other damage.
UNIT REPAIR (JR405E) 7A4-13
Reassembly steps
Coat the parts with ATF before installing them.
11CV18
1. Control valve upper body
2. Control valve lower body
3. Separation plate
Assemble the control valve upper body, the lower body, and
the separation plate.
Tighten the bolts to the specified torque.
Torque: 8 N
⋅⋅⋅⋅m (0.8 kgf⋅⋅⋅⋅m/69 Ib⋅⋅⋅⋅in)
244L300002
7A4-14 UNIT REPAIR (JR405E)
Number
Length
(Color)
Control valve rocket
bolts and nuts (A)
2 (Plus 2 nuts) 50 mm (1.97 in) (Gold)
Upper body and
lower body fixing
bolts
(B)
2
45 mm (1.77 in) (Silver)
(C)
13
35 mm (1.38 in) (Silver)
Line pressure
solenoid fixing bolt
(D)
1
16 mm (0.63 in) (Gold)
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст