Isuzu KB P190. Manual — part 352
6A-48 ENGINE MECHANICAL (4JK1/4JJ1)
2. Install the EGR cooler.
• Install the gaskets.
• Install the EGR cooler.
• Temporary tightening order.
1
→2→3→4→5→6
• Fully tightening order.
3
→4→5→1→2→6
Tighten the nut and bolts to the specified torque.
Tightening torque:
Nuts and bots 1-5: 27 N·m (2.8 kg·m / 20 lb ft)
Bolt 6:
52 N·m (5.3 kg·m / 38 lb ft)
6
5
4
3
1
2
RTW76FSH000201
3. Install the water hoses to the EGR cooler water
pipes.
4. Heat protector.
Tighten the bolts to the specified torque.
Tightening torque: 25 N·m (2.5 kg·m / 18 lb ft)
RTW76FSH000101
5. Install the turbocharger.
• Refer to “Turbocharger”.
6. Replenish the engine coolant.
ENGINE MECHANICAL (4JK1/4JJ1) 6A-49
Torque Specifications
RTW76AMF000701
6A-50 ENGINE MECHANICAL (4JK1/4JJ1)
Timing Gear Train
Components
RTW56ALF001101
Legend
1. Oil Pump Gear
2. Crankshaft
Gear
3. Idle Gear D
4. Exhaust Camshaft Gear
5. Intake Camshaft Gear
6. Idle Gear D Sprocket
7. Timing
Chain
8. Injection Pump Sprocket
9. Injection Pump Gear
10. Idle Gear A
11. Vacuum Pump Gear
12. Power Steering Oil Pump Gear
13. Idle Gear C
ENGINE MECHANICAL (4JK1/4JJ1) 6A-51
Removal
1. Partially drain the engine coolant.
2. Remove the radiator upper hose.
RTW56FSH000101
3. Remove the fan guide.
RTW46BSH000101
Legend
1. Fan
Guide
2. Clips
3. Lower Fan Guide
4. Fan
Shroud
4. Remove the cooling fan and fan pulley.
RTW56ASH025401
5. Remove the A/C compressor drive belt and fan
belt.
6. Remove the crank pulley.
7. Remove the power steering pump with hose.
RTW56ASH021101
Legend
1. Power Steering Pump
2. Nut
• Disconnect the bracket (1) of power steering oil
hose.
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст