Nissan Qashqai J11. Manual — part 613
M/T SHIFT SELECTOR
TM-27
< REMOVAL AND INSTALLATION >
[6MT: RS6F94R]
C
E
F
G
H
I
J
K
L
M
A
B
TM
N
O
P
4.
Press the ornament
down and lock shift lever knob
.
CAUTION:
Be careful with orientation of shift lever knob.
: Vehicle front
JSDIA6035ZZ
TM-28
< REMOVAL AND INSTALLATION >
[6MT: RS6F94R]
CONTROL LINKAGE
CONTROL LINKAGE
Exploded View
INFOID:0000000010735673
Removal and Installation
INFOID:0000000010735674
REMOVAL
1.
Shift shift lever to the neutral position.
2.
Remove center console assembly. Refer to
IP-19, "Removal and Installation"
Select cable
Grommet
Tapping bolt
Cable mounting bracket (M/T)
Select lever
Shift lever
Cable mounting bracket (floor)
Shift cable
M/T shift selector assembly
: N·m (kg-m, in-lb)
: N·m (kg-m, ft-lb)
: Always replace after every disassembly.
JSDIA5664GB
CONTROL LINKAGE
TM-29
< REMOVAL AND INSTALLATION >
[6MT: RS6F94R]
C
E
F
G
H
I
J
K
L
M
A
B
TM
N
O
P
3.
Pull up the stopper
of the select cable in the direction of the
arrow as shown in the figure.
4.
Pull out and disconnect shift cable
and select cable
from
each pin
of M/T shift selector assembly.
5.
Remove shift cable and select cable from M/T shift selector
assembly, as per the following procedure.
a.
While pressing the lock of the shift cable in the direction of the
arrow shown in the figure, remove shift cable from M/T shift
selector assembly.
b.
While pressing the lock of the select cable in the direction of the
arrow shown in the figure, remove select cable from M/T shift
selector assembly.
6.
Remove air duct and air cleaner body. Refer to
(HRA2DDT),
EM-279, "Removal and Installation"
(K9K).
7.
Remove battery and battery trays. Refer to
PG-155, "Removal and Installation"
8.
Pull out and disconnect the each cable from shift lever
and
select lever
.
JSDIA5762ZZ
JSDIA5763ZZ
JPDIC0793ZZ
JSDIA5761ZZ
TM-30
< REMOVAL AND INSTALLATION >
[6MT: RS6F94R]
CONTROL LINKAGE
9.
Remove shift cable and select cable from cable mounting
bracket (M/T), as per the following procedure.
a.
While pressing the lock of the shift cable in the direction of the
arrow shown in the figure, remove shift cable from cable mount-
ing bracket (M/T).
b.
While pressing the lock of the select cable in the direction of the
arrow shown in the figure, remove select cable from cable
mounting bracket (M/T).
10. Remove cable mounting bracket (M/T) from transaxle assembly.
11. Remove heat shield plate
.
12. Remove shift cable
and select cable
from cable mounting
bracket (floor)
.
13. Remove cable mounting bracket (floor).
14. Disengage the pawls
of grommet
, and pull downwards to
remove.
15. Remove shift cable and select cable from the vehicle.
INSTALLATION
Note the following, and install in the reverse order of removal.
• For each tightening torque, refer to
• Before working, set transaxle and M/T shift selector assembly to the neutral position.
• No occurrence of interference between cables and other parts, bent with a radius of 120 mm (4.72 in) or
less, and twist of 180 degrees or more.
• Do not damage the boot of each cable and prevent the occurrence of twist of 90 degrees or more.
• Tapping work for tapping bolts is not applied to new transaxle case. Do not perform tapping by other than
screwing tapping bolts because tapping is formed by screwing tapping bolts into transaxle case.
CAUTION:
Never reuse tapping bolt.
JPDIC0793ZZ
: Vehicle front
JSDIA5214ZZ
: Vehicle front
JSDIA5764ZZ
JPDIC0844ZZ
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст