Nissan Murano Z50 (2004 year). Manual — part 132
GW-48
POWER WINDOW SYSTEM
Revision: 2004 November
2004 Murano
5.
CHECK ENCODER SIGNAL
1.
Connect front power window motor (driver side) connector.
2.
Turn ignition switch ON.
3.
Check the signal between power window main switch connector and ground with oscilloscope.
OK or NG
OK
>> Replace power window main switch.
NG
>> GO TO 6.
6.
CHECK HARNESS CONTINUITY 3
1.
Turn ignition switch OFF.
2.
Disconnect power window main switch and front power window motor (driver side) connector.
3.
Check continuity between power window main switch connector
D6 terminal 13 and front power window motor (driver side) con-
nector D8 terminal 3.
OK or NG
OK
>> Replace front power window motor (driver side)
NG
>> Repair or replace harness between front power window
motor (driver side) and power window main switch.
Encoder Circuit Check (Front Passenger Side)
AIS002DL
1.
CHECK FRONT POWER WINDOW MOTOR (PASSENGER SIDE) POWER SUPPLY
1.
Turn ignition switch ON.
2.
Check voltage between front power window motor (passenger
side) connector D36 terminal 4 and ground.
OK or NG
OK
>> GO TO 3.
NG
>> GO TO 2.
Connector
Terminals (Wire color)
Condition
Signal
(Reference value)
(+)
(-)
D6
13 (G/Y)
Ground
opening
PIIA4205E
OCC3383D
13 (G/Y) – 3 (G/Y)
: Continuity should exist.
PIIA9674E
4 (G/R) – Ground
: Approx. 10V
PIIA9675E
POWER WINDOW SYSTEM
GW-49
C
D
E
F
G
H
J
K
L
M
A
B
GW
Revision: 2004 November
2004 Murano
2.
CHECK HARNESS CONTINUITY 1
1.
Turn ignition switch OFF.
2.
Disconnect front power window switch (passenger side) and front power window motor (passenger side).
3.
Check continuity between front power window switch (passen-
ger side) connector D35 terminal 4 and front power window
motor (passenger side) connector D36 terminal 4.
OK or NG
OK
>> Replace front power window switch (passenger side).
NG
>> Repair or replace harness between front power window
switch (passenger side) and front power window motor
(passenger side).
3.
CHECK GROUND CIRCUIT
1.
Turn ignition switch OFF.
2.
Disconnect front power window motor (passenger side) connector.
3.
Check continuity between front power window motor (passenger
side) connector D36 terminal 6 and ground.
OK or NG
OK
>> GO TO 5.
NG
>> GO TO 4.
4.
CHECK HARNESS CONTINUITY 2
1.
Disconnect front power window switch (passenger side) connector.
2.
Check continuity between front power window switch (passen-
ger side) connector D35 terminal 3 and front power window
motor (passenger side) connector D36 terminal 6.
OK or NG
OK
>> Replace front power window switch (passenger side).
NG
>> Repair or replace harness between front power window
motor (passenger side) and front power window switch
(passenger side).
4 (G/R) – 4 (G/R)
: Continuity should exist.
PIIA9676E
6 (W/B) – Ground
: Continuity should exist.
PIIA9668E
3 (W/B) – 6 (W/B)
: Continuity should exist.
PIIA9669E
GW-50
POWER WINDOW SYSTEM
Revision: 2004 November
2004 Murano
5.
CHECK ENCODER SIGNAL
1.
Connect front power window motor (passenger side) connector.
2.
Turn ignition switch ON.
3.
Check the signal between front power window switch (passenger side) connector and ground with oscillo-
scope.
OK or NG
OK
>> Replace front power window switch (passenger side).
NG
>> GO TO 6.
6.
CHECK HARNESS CONTINUITY 3
1.
Turn ignition switch OFF.
2.
Disconnect front power window switch (passenger side) and front power window motor (passenger side)
connector.
3.
Check continuity between front power window switch (passen-
ger side) connector D35 terminal 12 and front power window
motor (passenger side) connector D36 terminal 3.
OK or NG
OK
>> Replace front power window motor (passenger side).
NG
>> Repair or replace harness between front power window
switch (passenger side) and front power window motor
(passenger side).
Connec-
tor
Terminals (Wire color)
Condition
Signal
(Reference value)
(+)
(-)
D35
12 (G/Y)
Ground
opening
PIIA4209E
OCC3383D
12 (G/Y) – 3 (G/Y)
: Continuity should exist.
PIIA9677E
POWER WINDOW SYSTEM
GW-51
C
D
E
F
G
H
J
K
L
M
A
B
GW
Revision: 2004 November
2004 Murano
Door Switch Check
AIS002DO
First perform the “SELF-DIAG RESULTS” in “BCM” with CONSULT-II, then perform the each trouble
diagnosis of malfunction system indicated “SELF-DIAG RESULTS” of “BCM”. Refer to
Communication Inspection Using CONSULT-II (Self-Diagnosis)"
.
1.
CHECK DOOR SWITCH INPUT SIGNAL 1
With CONSULT-II
Check door switches (“DOOR SW-DR” and “DOOR SW-AS”) in “DATA MONITOR” mode with CONSULT-II.
Without CONSULT-II
Check voltage between BCM connector and ground.
OK or NG
OK
>> Door switch is OK.
NG
>> GO TO 2.
Monitor item
Condition
DOOR SW-DR
OPEN
: ON
CLOSE
: OFF
DOOR SW-AS
OPEN
: ON
CLOSE
: OFF
PIIA2464E
Item
Con-
nector
Terminals (Wire color)
Condition
Voltage (V)
(Approx.)
(+)
(-)
Passenger
side
M34
12 (R/G)
Ground
OPEN
0
CLOSE
Battery voltage
Driver
side
M36
62 (SB)
OPEN
0
CLOSE
Battery voltage
PIIA6158E
GW-52
POWER WINDOW SYSTEM
Revision: 2004 November
2004 Murano
2.
CHECK HARNESS CONTINUITY
1.
Turn ignition switch OFF.
2.
Disconnect BCM and front door lock assembly (driver and passenger side) connector.
3.
Check continuity between BCM connector M34, 36 terminals 12, 62 and front door lock assembly connec-
tor D10 (driver side), D38 (passenger side) terminal 4.
4.
Check continuity between BCM connector M34, 36 terminals 12,
62 and ground.
OK or NG
OK
>> GO TO 3.
NG
>> Repair or replace harness between BCM. and front door
lock assembly.
3.
CHECK DOOR SWITCH
Check continuity between front door lock assembly terminals 4 and
5.
OK or NG
OK
>> GO TO 4.
NG
>> Replace malfunction front door lock assembly.
4.
CHECK DOOR SWITCH GROUND CIRCUIT
Check continuity between front door lock assembly connector D10
(driver side), D38 (passenger side) terminal 5 and ground.
OK or NG
OK
>> GO TO 5.
NG
>> Repair or replace harness between front door lock
assembly and ground.
Driver side
62 (SB) – 4 (SB)
: Continuity should exist.
Passenger side
12 (R/G) – 4 (R/G)
: Continuity should exist.
12 (R/G) – Ground
: Continuity should not exist.
62 (SB) – Ground
: Continuity should not exist.
PIIB0907E
Terminal
Door switch
Continuity
4
5
OPEN
No
CLOSE
Yes
PIIA4220E
5 (B) – Ground
: Continuity should exist.
PIIA9680E
POWER WINDOW SYSTEM
GW-53
C
D
E
F
G
H
J
K
L
M
A
B
GW
Revision: 2004 November
2004 Murano
5.
CHECK UNIFIED METER AND A/C AMP. OUTPUT SIGNAL
1.
Connect unified meter and A/C amp. connector.
2.
Check voltage between unified meter ant A/C amp. connector
M49 terminal 7, 8 and ground.
OK or NG
OK
>> Check the condition of the harness and the connector.
NG
>> Check unified meter and A/C amp.
Front Door Key Cylinder Switch (Driver Side) Check
AIS002DP
1.
CHECK DOOR KEY CYLINDER SWITCH INPUT SIGNAL
With CONSULT-II
Check door key cylinder switch (“KEY CYL LK SW”, “KEY CYL UN SW”) in “DATA MONITOR” mode with
CONSULT-II.
Without CONSULT-II
Check voltage between power window main switch connector and ground.
OK or NG
OK
>> Further inspection is necessary. Refer to symptom
chart.
NG
>> GO TO 2.
7 (R) – Ground
: Battery voltage
8 (SB) – Ground
: Battery voltage
PIIA9678E
Monitor item
Condition
KEY CYL LK-SW
Lock
: ON
Neutral / Unlock
: OFF
KEY CYL UN-SW
Unlock
: ON
Neutral / Lock
: OFF
PIIA6285E
Connector
Terminals (Wire color)
Key position
Voltage (V)
(Approx.)
(+)
(–)
D6
4 (L)
Ground
Lock
0
Neutral / Unlock
5
6 (R)
Unlock
0
Neutral / Lock
5
PIIA4211E
GW-54
POWER WINDOW SYSTEM
Revision: 2004 November
2004 Murano
2.
CHECK HARNESS CONTINUITY
1.
Turn ignition switch OFF.
2.
Disconnect power window main switch and front door lock assembly (driver side) connector.
3.
Check continuity between power window main switch connector
D6 terminals 4, 6 and front door lock assembly (driver side) con-
nector D10 terminals 1, 6.
OK or NG
OK
>> GO TO 3.
NG
>> Repair or replace harness between power window main
switch and front door lock assembly (driver side).
3.
CHECK GROUND CIRCUIT
Check continuity between key cylinder switch (driver side) connector
D10 terminal 5 and ground.
OK or NG
OK
>> GO TO 4.
NG
>> Repair or replace harness.
4.
CHECK DOOR KEY CYLINDER SWITCH
Check continuity between key cylinder switch terminals 1, 6 and 5.
OK or NG
OK
>> GO TO 5.
NG
>> Replace key cylinder switch (driver side).
5.
CHEKC POWER WINDOW MAIN SWITCH OUTPUT SIGNAL
1.
Connect power window main switch connector.
2.
Check voltage between power window main switch connector
D6 terminal 4. 6 and ground.
OK or NG
OK
>> Check the condition of the harness and the connector.
NG
>> Replace power window main switch.
4 (L) – 1 (L)
: Continuity should exist.
6 (R) – 6 (R)
: Continuity should exist.
PIIA4212E
5 (B) – Ground
: Continuity should exist.
PIIA4213E
Terminals
Key position
Continuity
1
5
Neutral / Unlock
No
Lock
Yes
6
Neutral / Lock
No
Unlock
Yes
PIIA4214E
4 (L) – Ground
: Approx. 5V
6 (R) – Ground
: Approx. 5V
PIIA4211E
POWER WINDOW SYSTEM
GW-55
C
D
E
F
G
H
J
K
L
M
A
B
GW
Revision: 2004 November
2004 Murano
Power Window Serial Link Check
AIS002DR
1.
CHECK POWER WINDOW SWITCH OUTPUT SIGNAL
With CONSULT-II
Check door lock and unlock switch (“LOCK SW DR/AS”, “UNLK SW DR/AS”) in DATA MONITOR mode with
CONSULT-II. Refer to
Without CONSULT-II
1.
Remove key from ignition switch, and the door of driver side and passenger side is closed.
2.
Check the signal between BCM connector and ground with oscilloscope when door lock and unlock
switch (driver side and passenger side) is turned “LOCK” or “UNLOCK”.
3.
Make sure signals which are shown in the figure below can be detected during 10 second just after door
lock and unlock switch (driver side and passenger side) is turned “LOCK” or “UNLOCK”.
OK or NG
OK
>> GO TO 2.
NG
>> GO TO 3.
2.
CHECK BCM OUTPUT SIGNAL
Check power window serial link (“POWER WINDOW DOWN”) in “ACTIVE TEST” mode with CONSULT-II.
Refer to
OK or NG
OK
>> Further inspection is necessary. Refer to symptom
chart.
NG
>> Replace BCM.
Monitor item
Condition
LOCK SW DR / AS
LOCK
: ON
UNLOCK
: OFF
UNLK SW DR / AS
LOCK
: ON
UNLOCK
: OFF
PIIA6289E
Connector
Terminals (Wire color)
Signal
(Reference value)
(+)
(–)
M34
22 (BR/W)
Ground
PIIA6290E
PIIA1297E
When “ACTIVE TEST” is executed, is the window of
driver and passenger side lowered.
PIIA3080E
GW-56
POWER WINDOW SYSTEM
Revision: 2004 November
2004 Murano
3.
CHECK POWER WINDOW SWITCH GROUND
1.
Turn ignition switch OFF.
2.
Disconnect power window main switch and front power window switch (passenger side) connector.
3.
Check continuity between power window main switch connector
D7 terminal 17 and ground.
4.
Check continuity between front power window switch (passen-
ger side) connector D35 terminal 11 and ground.
OK or NG
OK
>> GO TO 4.
NG
>> Repair or replace harness.
4.
CHECK POWER WINDOW SERIAL LINK CIRCUIT
1.
Disconnect BCM connector.
2.
Check continuity between BCM connector M34 terminal 22 and
power window main switch connector D6 terminal 14.
3.
Check continuity between BCM connector M34 terminal 22 and
front power window switch (passenger side) connector D35 ter-
minal 16.
OK or NG
OK
>> Replace power window main switch.
NG
>> Repair or replace harness.
17 (B) – Ground
: Continuity should exist.
PIIA4172E
11 (B) – Ground
: Continuity should exist.
PIIA4175E
22 (BR/W) – 14 (BR/W)
: Continuity should exist.
PIIA6291E
22 (BR/W) – 16 (BR/W)
: Continuity should exist.
PIIA6292E
POWER WINDOW SYSTEM
GW-57
C
D
E
F
G
H
J
K
L
M
A
B
GW
Revision: 2004 November
2004 Murano
Power Window Lock Switch Check
AIS002EM
1.
CHECK POWER WINDOW MAIN SWITCH
Exchanges for a normal power window main switch, and operation is checked.
OK or NG
OK
>> Replace malfunction power window main switch.
NG
>> Check the condition of the harness and the connector.
Does power window lock operate?
GW-58
FRONT DOOR GLASS AND REGULATOR
Revision: 2004 November
2004 Murano
FRONT DOOR GLASS AND REGULATOR
PFP:80300
Removal and Installation
AIS001SF
REMOVAL
1.
Remove the front door finisher. Refer to
2.
Operate the power window main switch to raise/lower the door
window until the glass mounting bolts can be seen.
3.
Remove the glass mounting bolts.
4.
Remove the module stop bolts.
5.
While holding the door glass, raise it at the rear end to pull the
glass out of the sash toward the outside of the door.
1. Door glass
2.
Regulator assembly
3.
Power window motor
4.
Module assembly
PIIA3786E
PIIA3789E
PIIA4004E
FRONT DOOR GLASS AND REGULATOR
GW-59
C
D
E
F
G
H
J
K
L
M
A
B
GW
Revision: 2004 November
2004 Murano
6.
Remove the mounting bolts, and remove the module assembly.
7.
Disconnect the harness connector for the module assembly, and
unclip the harness from the back.
INSTALLATION
Install in the reverse order of removal.
INSPECTION AFTER REMOVAL
Check the regulator assembly for the following items. If a malfunc-
tion is detected, replace or grease it.
●
Wire wear
●
Regulator deformation
●
Grease condition for each sliding part
The arrows in the figure show the application points of the multi-pur-
pose grease.
DISASSEMBLY AND ASSEMBLY
Remove the power window motor and guide rail from the module
assembly.
SIIA0287E
PIIA3787E
PIIA3788E
GW-60
FRONT DOOR GLASS AND REGULATOR
Revision: 2004 November
2004 Murano
SETTING AFTER INSTALLATION
Resetting of Limit Switch
If any of the following work has been done, reset the limit switch (integrated in the motor).
●
Removal and installation of the regulator.
●
Removal and installation of the motor from the regulator.
●
Operate the regulators as a unit.
●
Removal and installation of the glass.
●
Removal and installation of the glass run.
Resetting
After installing each component to the vehicle, follow the steps below.
1.
Remove the motor from regulator.
2.
Connect the connector. Rotate the motor unit with power window switch for more than 5 sec in glass rais-
ing direction.
3.
Install motor to regulator.
4.
Raise glass to the top position.
CAUTION:
Do not use Auto switch to raise the glass to the top position.
FITTING INSPECTION
●
Make sure the glass is securely fit into the glass run groove.
●
Lower the glass slightly [approx. 10 to 20 mm (0.39 to 0.79 in)] and make sure the clearance to the sash is
parallel. If the clearance between the glass and sash is not parallel, loosen the regulator mounting bolts,
guide rail mounting bolts, and glass and guide rail mounting bolts to correct the glass position.
REAR DOOR GLASS AND REGULATOR
GW-61
C
D
E
F
G
H
J
K
L
M
A
B
GW
Revision: 2004 November
2004 Murano
REAR DOOR GLASS AND REGULATOR
PFP:82300
Removal and Installation
AIS001SG
REMOVAL
1.
Remove the rear door finisher. Refer to
.
2.
Remove the rear door outside molding. Refer to
.
3.
Remove the sealing screen.
4.
Remove the rear lower sash.
5.
Operate the power window switch to raise/lower the door win-
dow until the glass mounting bolts can be seen.
6.
Remove the glass mounting bolts, and place the glass on the
inner bottom of the panel.
1.
Door glass
2.
Regulator assembly
3.
Power window motor
PIIA3790E
PIIA3791E
GW-62
REAR DOOR GLASS AND REGULATOR
Revision: 2004 November
2004 Murano
7.
Remove the regulator mounting bolts, and remove the regulator
from the panel.
8.
Disconnect the connector for the regulator assembly.
INSTALLATION
Install in the reverse order of removal.
INSPECTION AFTER REMOVAL
Check the regulator assembly for the following items. If a malfunction is detected, replace or grease it.
●
Wire wear
●
Regulator deformation
●
Grease condition for each sliding part
The arrows in the figure show the application points of the multi-pur-
pose grease.
FITTING INSPECTION
●
Make sure the glass is securely fit into the glass run groove.
●
Lower the glass slightly [approx. 10 to 20 mm (0.39 to 0.79 in)], and make sure the clearance to the sash
is parallel. If the clearance between the glass and sash is not parallel, loosen the regulator mounting bolts,
guide rail mounting bolts, and glass and carrier plate mounting bolts to correct the glass position.
PIIA3792E
PIIA6327J
INSIDE MIRROR
GW-63
C
D
E
F
G
H
J
K
L
M
A
B
GW
Revision: 2004 November
2004 Murano
INSIDE MIRROR
PFP:96321
Wiring Diagram –I/MIRR–
AIS001SH
TIWA0440E
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.