Suzuki Grand Vitara JB416 / JB420. Manual — part 84
1D-4 Engine Mechanical: For M16A Engine with VVT
Targeted Timing Varying Operation
Diagnostic Information and Procedures
Compression Check
S5JB0A1414001
Check compression pressure on all 4 cylinders as
follows:
1) Warm up engine to normal operating temperature.
2) Stop engine after warming up.
NOTE
After warming up engine, place transaxle
gear shift lever in “Neutral”, and set parking
brake and block drive wheels.
3) Disconnect ignition coil couplers (1).
4) Remove ignition coil assemblies (2) with high-
tension cord (3).
5) Remove all spark plugs.
6) Disconnect fuel injector wires (4) at the coupler.
Driving condition
Valve timing
Target of control
Effect
Engine running at idle
speed
Most retarded
To shorten the valve opening overlap in
order to prevent the exhaust gas
counterflow to intake manifold.
Stabilization of the engine
rotation at idle speed.
Average engine load
range
To the advanced
side
To lengthen the valve opening overlap
in order to enhance the internal
exhaust gas recirculation and reduce
the pumping loss.
Improvement of the fuel
efficiency.
Lowering of the exhaust
emission.
Light engine load
range
To the retarded side
To shorten the valve opening overlap in
order to prevent the exhaust gas
counterflow to intake manifold.
Keeping of the engine stability.
Low or average
engine speed range
with heavy engine
load
To the advanced
side
To advance the closing timing of the
intake valve in order to improve the
volumetric efficiency.
Improvement of generating the
engine torque at low and
average engine speed.
High engine speed
range with heavy
engine load
To the retarded side
To retard the closing timing of the
intake valve in order to improve the
volumetric efficiency.
Improvement of generating the
engine power.
Low engine coolant
temperature
Most retarded
To shorten the valve opening overlap in
order to prevent the exhaust gas
counterflow to intake manifold and
reduce the fuel increasing.
To slow the fast idle speed of the
engine as a result of stabilizing the
engine idling.
Stabilization of the fast idling of
the engine.
Improvement of the fuel
efficiency.
At engine starting and
stopping
Most retarded
To shorten the valve opening overlap in
order to prevent the exhaust gas
counterflow to intake manifold.
Improvement of start ability.
I2RH0B140003-01
Engine Mechanical: For M16A Engine with VVT 1D-5
7) Install special tools (Compression gauge) into spark
plug hole.
Special tool
(A): 09915–64512
(B): 09915–64530
(C): 09915–67010
8) Disengage clutch (to lighten starting load on engine)
for M/T vehicle, and depress accelerator pedal (1) all
the way to make throttle fully open.
9) Crank engine with fully charged battery, and read the
highest pressure on compression gauge.
NOTE
• For measuring compression pressure,
crank engine at least 250 r/min. by using
fully charged battery.
• If measured compression pressure is
lower than limit value, check installation
condition of special tool. If it is properly
installed, possibility is compression
pressure leakage from where piston ring
and valve contact.
Compression pressure
Standard: 1400 kPa (14.0 kg/cm
2
, 199.0 psi)
Limit: 1100 kPa (11.0 kg/cm
2
, 156.0 psi)
Max. difference between any two cylinders: 100
kPa (1.0 kg/cm
2
, 14.2 psi)
10) Carry out Steps 7) through 9) on each cylinder to
obtain 4 readings.
11) After checking, install spark plugs and ignition coil
assemblies (2) with high-tension cord (3).
12) Connect ignition coil couplers (1).
13) Connect fuel injector wires (4) at the coupler.
Engine Vacuum Check
S5JB0A1414002
The engine vacuum that develops in the intake line is a
good indicator of the condition of the engine. The
vacuum checking procedure is as follows:
1) Warm up engine to normal operating temperature.
NOTE
After warming up engine, be sure to place
transaxle gear shift lever in “Neutral”, and set
parking brake and block drive wheels.
2) Stop engine and turn off the all electric switches.
3) Remove PCV hose (1) from PCV valve (2).
4) Connect special tool (Vacuum gauge) to PCV hose
(1).
Special tool
(A): 09915–67311
5) Blind PCV valve (2) using tape or the like.
(A)
(C)
(B)
I3RH0B140009-01
I5JB0A141001-02
I2RH0B140003-01
1
2
I5RS0D140013-01
(A)
1
2
I5JB0A141002-02
1D-6 Engine Mechanical: For M16A Engine with VVT
6) Run engine at specified idle speed and read vacuum
gauge. Vacuum should be within specification.
Vacuum specification (at sea level)
59 – 73 kPa (45 – 55 cmHg, 17.7 – 21.6 in.Hg) at
specified idle speed
7) After checking, disconnect special tool (Vacuum
gauge) from PCV hose.
8) Detach blind cap from PCV valve.
9) Connect PCV hose to PCV valve.
Valve Lash (Clearance) Inspection
S5JB0A1414003
1) Remove negative cable at battery.
2) Remove cylinder head cover referring to “Cylinder
Head Cover Removal and Installation: For M16A
Engine with VVT”.
3) Using 17 mm wrench, turn crankshaft pulley (1)
clockwise until cam lobes (2) become perpendicular
to shim faces (3) at valves “1” and “7” as shown in
the figure.
4) Check valve lashes with thickness gauge (4)
according to the following procedure.
a) Check valve lashes at valves “1” and “7”.
b) Turn camshafts by 90
° (by turning crankshaft
with wrench).
c) Make sure that cam lobes are perpendicular to
shim faces at valves to be checked (in this case,
“3” and “8”), if not, adjust it by turning crankshaft.
Check valve lashes.
d) In the same manner as b) – c), check valve
lashes at valves “4” and “6”.
e) In the same manner as b) – c) again, check
valve lashes at valves “2” and “5”.
If valve lash is out of specification, record valve lash and
adjust it to specification by replacing shim.
Valve clearance specification
When cold (Coolant temperature is 15 – 25
°C (59 –
77
°F)):
• Intake: 0.18 – 0.22 mm (0.007 – 0.009 in.)
• Exhaust: 0.28 – 0.32 mm (0.011 – 0.013 in.)
When hot (Coolant temperature is 60 – 68
°C (140 –
154
°F)):
• Intake: 0.21 – 0.27 mm (0.008 – 0.011 in.)
• Exhaust: 0.30 – 0.36 mm (0.012 – 0.014 in.)
Replacement of Shim
1) Close the valve whose shim (2) is to be replaced by
turning crankshaft, then turn tappet (3) till its cut
section (1) faces inside as shown in the figure.
I3RM0A140004-01
I2RH0B140006-01
Engine Mechanical: For M16A Engine with VVT 1D-7
2) Lift down the valve by turning crankshaft to 360
°.
3) Hold tappet at that position using special tool as
follows.
a) Remove its housing bolts.
b) Check housing No. and select special tool
corresponding to housing No., referring to
“Special tool selection table”.
Special tool selection table
c) Hold down the tappet so as not to contact the
shim by installing special tool on camshaft
housing with housing bolt (1) tighten housing
bolts to specified torque.
Special tool
(A): 09916–67020
(A): 09916–67021
Tightening torque
Camshaft housing bolts (a): 8 N
⋅m (0.8 kgf-
m, 6.0 lb-ft) for tightening of special tool
4) Turn camshaft by approximately 90
° clockwise and
remove shim (3).
WARNING
!
Never put in the hand between camshaft and
tappet.
5) Using a micrometer (2), measure the thickness of
the removed shim (1), and determine replacement
shim by calculating the thickness of new shim with
the following formula and table.
Shim thickness specification
Intake side:
A = B + C – 0.20 mm (0.008 in.)
Exhaust side:
A = B + C – 0.30 mm (0.012 in.)
A: Thickness of new shim
B: Thickness of removed shim
C: Measured valve clearance
For example of intake side:
When thickness of removed shim is 2.40 mm (0.094
in.), and measured valve clearance is 0.45 mm
(0.018 in.).
A = 2.40 mm (0.094 in.) + 0.45 mm (0.018 in.) – 0.20
mm (0.008 in.) = 2.65 mm (0.104 in.)
Calculated thickness of new shim = 2.65 mm (0.104
in.)
No. on camshaft
housing
Embossed mark on
special tool
I2
IN2
I3, I4, I5
IN345
E2
EX2
E3, E4, E5
EX345
A: I: Intake side or E: Exhaust side
B: Position from timing chain side
C: Pointing to timing chain side
I2RH0B140011-01
I3RM0A140005-01
1. Special tool
2. Magnet
I2RH0B140013-01
I2RH0B140014-01