Toyota Tundra. Manual — part 1911
Fig. 425: Applying Seal Packing Threads Of Drain Cock
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
b
Install the 2 drain cocks as shown below
Torque: 49 N*m (500 kgf*cm, 36 ft.*lbf)
15
INSTALL CYLINDER HEAD GASKET LH (See INSTALLATION )
16
INSTALL CYLINDER HEAD SUB-ASSEMBLY LH (See INSTALLATION )
17
INSTALL CYLINDER HEAD GASKET RH (See INSTALLATION )
18
INSTALL CYLINDER HEAD SUB-ASSEMBLY RH (See INSTALLATION )
19
INSTALL VALVE LIFTER
a
Apply a light coat of engine oil to the valve lifters and shims
b
Install the valve lifters and shims
c
Check that the valve lifter rotates smoothly by hand
20
INSTALL CAMSHAFT SETTING OIL SEAL
a
Insert 2 new oil seals into the camshaft timing tube until they reach the stopper
NOTE:
Do not rotate the drain cocks more than 1 revolution (360°) after
tightening the drain cocks to the specified torque.
Do not loosen the drain cocks to adjust them. If an adjustment
is necessary, remove the drain cocks and reinstall them.
Fig. 426: Identifying Drain Cocks
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
2009 Toyota Tundra
2009 ENGINE Engine Mechanical (2UZ-FE) - Tundra
21
INSTALL CAMSHAFT TIMING TUBE ASSEMBLY
a
Align the timing tube knock pin with the knock pin groove of the drive gear, and temporarily install
the drive gear with the 4 bolts
b
Using SST and a 5 mm hexagon wrench, uniformly tighten the 4 bolts in several steps
Torque: 7.5 N*m (76 kgf*cm, 66 in.*lbf)
SST 09960-10010 (09962-01000, 09963-00500)
Fig. 428: Tightening Camshaft Timing Tube Assembly Bolts Using SST & Hexagon Wrench
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
c
Mount the hexagonal portion of the camshaft in a vise
NOTE:
Be careful of the installation direction.
Do not turn over the lip of the oil seal.
Fig. 427: Identifying Camshaft Setting Oil Seal
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
NOTE:
Be careful not to damage the timing tube.
NOTE:
Be careful not to damage the camshaft.
2009 Toyota Tundra
2009 ENGINE Engine Mechanical (2UZ-FE) - Tundra
Fig. 429: Identifying Hexagonal Portion Of Camshaft
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
d
Align the camshaft knock pin with the knock pin groove of the timing tube, and push the timing
tube by hand until it touches the bottom
e
Using a 10 mm hexagon wrench, install the bolt
Torque: 78 N*m (795 kgf*cm, 58 ft.*lbf)
f
Install the seal washer and screw plug
Torque: 15 N*m (153 kgf*cm, 11 ft.*lbf)
Fig. 430: Tightening Bolt Using Hexagon Wrench
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
22
INSTALL CAMSHAFT SUB-GEAR
a
Install the gear spring [1], sub-gear [2] and wave washer [3]
HINT:
Attach the pins on the gears to the gear spring ends
2009 Toyota Tundra
2009 ENGINE Engine Mechanical (2UZ-FE) - Tundra
Fig. 431: Identifying Gear Spring, Sub Gear & Wave Washer
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
b
Using snap ring pliers, install the snap ring
Fig. 432: Using Snap Ring Pliers To Remove Snap Ring
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
c
Mount the hexagonal portion of the camshaft in a vise
Fig. 433: Identifying Hexagonal Portion Of Camshaft In Vise
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
d
Using SST, align the holes of the driven main gear and sub-gear by turning the sub-gear clockwise,
and temporarily install a service bolt
NOTE:
Be careful not to damage the camshaft.
2009 Toyota Tundra
2009 ENGINE Engine Mechanical (2UZ-FE) - Tundra
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст