Toyota Tundra. Manual — part 1275
Fig. 280: Identifying J9 Ignition Switch Connector & A24 ECM Connector Terminals
OK : Go to next step.
12. CHECK HARNESS AND CONNECTOR (PNP SWITCH - ECM)
a. Disconnect the D35 PNP switch connector.
b. Disconnect the D74 ECM connector.
c. Measure the resistance according to the value (s) in the table below.
Standard resistance (Check for open)
TESTER CONNECTION SPECIFIED CONDITION
Standard resistance (Check for short)
TESTER CONNECTION SPECIFIED CONDITION
Tester Connection
Condition Specified Condition
D35-4 - D74-16 (STAR) Always
Below 1 ohms
Tester Connection
Condition Specified Condition
D35-4 or D74-16 (STAR) - Body ground Always
10 kohms or higher
2008 Toyota Tundra
2008 ENGINE PERFORMANCE Engine Control System (1GR-FE) - Tundra
NG : REPAIR OR REPLACE HARNESS OR CONNECTOR
Fig. 281: Identifying D35 PNP Switch Connector & D74 ECM Connector
OK : REPLACE ECM (See REMOVAL )
ACIS CONTROL CIRCUIT
DESCRIPTION
This circuit opens and closes the Intake Air Control Valve (IACV) in response to changes in the engine load in
order to increase the intake efficiency (ACIS: Acoustic Control Induction System).
When the engine speed is between 2200 RPM and 4100 RPM and the throttle valve opening angle is 60° or
more, the ECM supplies current to the VSV (ON status), to close the IACV. Under other conditions, the VSV is
usually OFF and the IACV is open.
2008 Toyota Tundra
2008 ENGINE PERFORMANCE Engine Control System (1GR-FE) - Tundra
Fig. 282: Throttle Valve Opening Angle Graph
WIRING DIAGRAM
Fig. 283: ACIS Control Circuit - Wiring Diagram
INSPECTION PROCEDURE
1. PERFORM ACTIVE TEST USING TECHSTREAM (OPERATE VSV FOR ACIS)
a. Disconnect the vacuum hose.
b. Connect the Techstream to the DLC3.
c. Turn the ignition switch ON and turn the Techstream ON.
d. Enter the following menus: Powertrain/Engine and ECT/Active Test/Active the VSV for Intake
Control. Operate the VSV for ACIS.
e. Check the VSV operation when it is operated using the Techstream.
Standard
2008 Toyota Tundra
2008 ENGINE PERFORMANCE Engine Control System (1GR-FE) - Tundra
ACTIVE TEST CHART
Fig. 284: Checking VSV Operation
Result
RESULT CHART
f. Reconnect the vacuum hose.
B : Go to step 4
A : Go to next step.
2. CHECK VSV FOR ACIS (OPERATION)
a. Inspect VSV for ACIS. (See ON-VEHICLE INSPECTION ).
NG : REPLACE VSV FOR ACIS
OK : Go to next step.
3. CHECK HARNESS AND CONNECTOR (VSV FOR ACIS - ECM, VSV FOR ACIS - EFI NO. 2
FUSE)
a. Check the wire harness and connectors between the VSV for ACIS and ECM.
1. Disconnect the D61 VSV for ACIS connector.
2. Disconnect the D74 ECM connector.
3. Measure the resistance according to the value (s) in the table below.
Standard resistance (Check for open)
Tester Operation
Specified Condition
VSV ON
Air from port E flows out through port F
VSV OFF
Air from port E flows out through air filter
Result Proceed To
NG
A
OK
B
2008 Toyota Tundra
2008 ENGINE PERFORMANCE Engine Control System (1GR-FE) - Tundra
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст