Jaguar XJ (X350). Manual — part 337
8
.
NOTE:
The intake manifold retaining bolts in position 1, 4 and 5 are longer than the retaining
bolts in position 2, 3 and 6.
Reposition the intake manifold.
Tighten to 10 Nm.
Complete the tightening sequence.
9 . Install the fuel pressure sensor bracket retaining bolt.
10 . Attach the fuel pressure sensor bracket.
11 . Install the engine cover left-hand side retaining bracket.
12 . Attach the evaporative emission canister purge valve transfer pipe.
13 . Install the engine cover front retaining bracket.
www.
14 . Attach the coolant temperature sensor wiring harness.
15 . Attach the intake manifold front retaining bracket.
16 . Fully tighten the intake manifold front retaining bracket.
17 . Fully tighten the intake manifold right-hand side retaining bracket.
18 . Fully tighten the intake manifold right-hand side retaining bracket.
19 . Attach the engine wiring harness to the intake manifold side retaining bracket.
20 . NOTE:
Un-cap the coolant hoses.
Attach the coolant hoses to the throttle body.
21 . Connect the positive crankcase ventilation (PCV) hose.
www.
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст