Jaguar XJ (X350). Manual — part 1228
Lubricate the new 0-ring seal with A/C refrigerant oil.
2 . Install the pressure cutoff switch.
1) Tighten to 8 Nm.
3 . Connect the pressure cutoff switch electrical connector.
4 . Clean off any oil residue that may contain A/C system fluorescent dye.
5 . Install the air cleaner.
For additional information, refer to Air Cleaner (19.10.05)
For additional information, refer to Air Cleaner (19.10.05)
6 . Carry out the A/C system fluorescent dye leak detection procedure.
For additional information, refer to Fluorescent Dye Leak Detection
Pressure Cutoff Switch - 2.7L V6 - TdV6
(82.10.32)
Removal
1
.
Carry out the air conditioning (A/C) system recovery procedure.
For additional information, refer to Air Conditioning (A/C) System Recovery, Evacuation and
Charging (82.30.30)
2 . Remove the radiator splash shield.
For additional information, refer to Radiator Splash Shield (76.22.90)
3 . Disconnect the pressure cutoff switch electrical connector.
4 . Remove the pressure cutoff switch.
Remove and discard the pressure cutoff switch O-ring seal.
www.
Installation
1 . NOTE:
Install a new pressure cutoff switch O-ring seal.
NOTE:
Lubricate the new O-ring seal with A/C refrigerant oil.
Install the pressure cutoff switch.
Tighten to 8 Nm.
2 . Connect the pressure cutoff switch electrical connector.
3 . Clean off any oil residue that may contain A/C system fluorescent dye.
4 . Install the radiator splash shield.
For additional information, refer to Radiator Splash Shield (76.22.90)
5
.
Carry out the A/C system evacuation and charging procedure.
For additional information, refer to Air Conditioning (A/C) System Recovery, Evacuation and
Charging (82.30.30)
6 . Carry out the A/C system fluorescent dye leak detection procedure.
For additional information, refer to Fluorescent Dye Leak Detection
www.
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст