Iveco EuroCargo (12 to 26 t). Manual — part 202
79631
79632
79633
79634
Figure 88
Figure 89
Figure 90
Figure 91
- Unscrew screws (2) securing instrument panel support
bracket located at air conveyor (1) side.
- Unscrew securing nuts (3) and detachcode central unit (1);
- unscrew screws (2) of instrument panel bracket support
to body.
- Pull out steering wheel hub cap (1);
- unscrew nut (2) and detach steering wheel (3);
- unscrew securing screws (4) and remove steering column
covering (5);
- operating from steering column side, unscrew instrument
panel support bracket securing screws (6) (see LENS).
- Unscrew securing screws (2), disconnect electric
connections and remove windscreen drive lever (1).
E
URO
C
ARGO
T
ECTOR
12-26 t
40
BODY - CHASSIS
Base — February 2003
79635
79637
79636
79638
79639
Figure 92
Figure 93
Figure 94
Figure 95
Figure 96
- Unscrew securing screws (1) and detach diagnosis socket
(2).
- Lift radiator cowling, unscrew securing screws (1) and
detach guard (2).
- Unscrew screws (3) securing conditioner (6) to cab front
wall;
- unscrew expansion valve (4) securing screws (5);
- disconnect heater piping (2) and unscrew securing screws
(1).
- Operate inside Body Control opening, unscrew
instrument panel covering bracket (2) securing screws
(1);
- remove door open light wiring harness;
- remove duct diffusing air to feet.
- Unscrew screws (1) securing heater to instrument panel;
- unscrew securing screws (3) and remove instrument
panel support bracket (2) operating from instrument
board opening (as shown in box);
- remove air duct from heater to instrument panel.
E
URO
C
ARGO
T
ECTOR
12-26 t
BODY - CHASSIS
41
Base — February 2003
79640
79642
79641
79643
79645
Figure 97
Figure 98
Figure 99
Figure 100
Figure 101
- With help from a second operator, properly detach
instrument panel (1) covering from the vehicle.
Refitting
Perform
instrument
panel
(1)
covering
re-attaching
operations properly inverting described detaching operations.
533210
HEATING AND VENTILATION
Removal
Perform detaching procedure on:
- instrument panel (1) (OP. 553710);
- middle instrument panel (2) (OP. 553710);
- instrument panel covering (3) (OP. 552211);
- remove interfering parts.
- Operate from heater (2) rear side and disconnect electric
cable bundle check clamps (1).
- Remove vehicle heating and ventilation unit (1).
Refitting
Perform heating and ventilation unit re-attaching
operations inverting described detaching operations.
1
E
URO
C
ARGO
T
ECTOR
12-26 t
42
BODY - CHASSIS
Base — February 2003
E
URO
C
ARGO
T
ECTOR
12-26 t
SERVICE PLAN
1
SECTION 13
Service plan
Page
SERVICING
3
. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
-
Service plan
3
. . . . . . . . . . . . . . . . . . . . . . . . . . .
EXTRA PLAN OPERATIONS
3
. . . . . . . . . . . . . . .
SERVICE FREQUENCY
3
. . . . . . . . . . . . . . . . . . . .
-
Extra plan operations (to be carried out possibly at
the same time as a planned service operation)
3
SCHEDULED MAINTENANCE OPERATIONS
4
.
EXTRA-PLAN OPERATIONS
4
. . . . . . . . . . . . . . .
SCHEDULED MAINTENANCE OPERATION
7
. .
EXTRA-PLAN OPERATIONS
7
. . . . . . . . . . . . . . .
M1 SERVICE
8
. . . . . . . . . . . . . . . . . . . . . . . . . . . .
M2 SERVICE
9
. . . . . . . . . . . . . . . . . . . . . . . . . . . .
M3 SERVICE
12
. . . . . . . . . . . . . . . . . . . . . . . . . . . .
EXTRA-PLAN MAINTENANCE
12
. . . . . . . . . . . . .
EP1 SERVICE
12
. . . . . . . . . . . . . . . . . . . . . . . . . . . .
EP2 SERVICE
13
. . . . . . . . . . . . . . . . . . . . . . . . . . . .
EP3 SERVICE
13
. . . . . . . . . . . . . . . . . . . . . . . . . . . .
EP4 SERVICE
14
. . . . . . . . . . . . . . . . . . . . . . . . . . . .
EP5 SERVICE
14
. . . . . . . . . . . . . . . . . . . . . . . . . . . .
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст