Geely Emgrand X7. Manual part — 284
Geely Emgrand X7. Manual part - 284
18. Dismantle transmission housing
Note: when spring snap ring expands, spring snap
ring may be pulled off due to self weight of output
shaft.
弹簧卡环
GC03-0054b
19. Dismantle outer ring.
20. Dismantle the washer.
21. Dismantle magnetic plug seat.
22. Dismantle spring pin.
23. Dismantle 1st speed -2nd speed shifting slide
rail component.
24. Dismantle 1st speed -2nd speed shifting fork.
25. Dismantle spring pin.
26. Dismantle 3rd -4th speed shift sliding rail
module。
三档-四档
换挡拨叉
五档-倒档
换挡拨叉
GC03-0055b
27. Dismantle 3rd -4th speed shift fork。
28. Dismantle 5th speed - Reverse gear shifting
slide rail component.
29. Dismantle 5
th
speed - Reverse gear shifting
fork.
30. Dismantle front bearing pedestal.
三档-四档
换挡拨叉
五档-倒档
换挡拨叉
GC03-0056b
Spring snap ring
5th speed
-reverseshift
fork
3rd speed-4th
speedshift fork
5th speed
-reverseshift
fork
3rd speed-4th
speedshift fork
1135
31. Dismantle input shaft.
32. Dismantle output shaft.
33. Dismantle differential components.
34. Dismantle the clutch housing.
输入轴
输出轴
GC03-0057b
Transmission adjustment before installation:
1. Place soldering tin (with a length of 10 mm and a
diameter of 1.6 mm more or less) on the position
on the differential case as shown in the diagram.
Then install bearing outer ring and differential.
2. Install clutch housing and tighten bolt to
specified torque.
3. If soldering tin is not flat, it should be replaced
with more thick soldering tin. Then repeat
procedures (1) and (2).
垫圈
GC03-0058b
4. Use micrometer caliper to measure flattened
soldering tin thickness (T), selec washer
thickness according to the following range.
Washer thickness: ( T+0.05 mm)-( T+0.11 mm)
GC03-0059b
Installation procedure::
Output shaft
Input shaft
Washer
1136
1. Install
clutch
housing.
2. Install
differential
components.
3. Install
output
shaft.
4. Install input shaft.
输入轴
输出轴
GC03-0057b
5. Install front bearing seat.
6. Install 5th speed - Reverse gear shifting fork.
7. Install 5th speed - Reverse gear shifting slide
rail component.
三档-四档
换挡拨叉
五档-倒档
换挡拨叉
GC03-0060b
8. Install
3
rd
speed -4th speed shifting fork.
9. Install 3rd speed-4th speed shifting slide rail
component.
三档-四档
换挡拨叉
五档-倒档
换挡拨叉
GC03-0061b
Output shaft
Input shaft
5th speed
-reverseshift
fork
3rd speed-4th
speedshift
fork
3rd speed-4th
speedshift
fork
5th speed
-reverseshift
fork
1137
10. Install spring pin.
GC02-0062b
11. Install 1st-2nd speed shift fork.
12. Install 1st-2nd speed shift sliding rail component
13. Install spring pin.
14. Install magnetic plug seat.
15. Install washer.
16. Install outer race.
GC03-0063b
17. Install transmission housing.
Note: The extruded sealant line shall be uniform
and continuous. No disconnection or excessive
application is allowed.
18. Install seal cover.
19. Install reverse gear and shaft.
20. Install seal gasket.
21. Install Reverse intermediate gear shaft bolt.
22. Install lower cover.
弹簧卡环
GC03-0054b
Spring snap
ring
1138
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст