Geely Emgrand X7. Manual part — 127

Geely Emgrand X7. Manual part - 127

9. Install first air ring.

Note: The side of the piston ring with
marker should face the piston top.

10. Apply the engine oil to the

connecting rod bearings and
install the connecting rod journal
and the bearing cap.

11. Install the connecting rod to the

crankshaft. Inspect whether the
bearing clearance is acceptable.
Refer to 2.6.1.2 "Mechanical
System Specification".

Standard Value

0.0200.044 mm(Metric)

0.00070.0017 in (English system)

13. Install and inspect the qualified

piston connecting rod
components.

FE02-0286b

507

2.6.8.21 Valve Clearance Adjustment

1. Dismantle the plastic shield of engine. Refer to 2.6.8.1 Replacement of Plastic Shield of

Engine.

2. Refer to 2.10.7.3 "Replacement of Ignition Coil" to dismantle the ignition coil.

3. Refer to 2.6.8.2 "Replacement of Cylinder Hood Cover" to dismantle the cylinder hood

cover.

4. Refer to 2.6.8.9 "Replacement of

Timing Chain Shroud" to
dismantle the timing chain
shroud and rotate the crankshaft
making cylinder No.1 at
compression TDC position.

5. Inspect valve clearance. Use the

plug gage to measure valve
clearance value, as arrows shown
in the graphic and record the
valve location and tolerance that
exceeds the tolerance.

Valve clearance standard value
(Cold):

Air intake

0.25±0.03mm

Exhaust: 0.3±0.03mm

FE02-3060b

6. Rotate the crankshaft one circle

(360 °), making the cylinder No.
4 stop at the compression TDC
position. Measure the valve
clearance as arrow pointed in the
graph and record the clearance.

FE02-3061b

508

7. Use a jack to support the engine.

Dismantle the timing chain.
Refer to 2.6.8.10 "Replacement
of Timing Chain"

8. Refer to 2.6.8.12 “Replacement

of Camshaft” to dismantle the
camshaft.

9. Remove the valve lifter that

exceeds the tolerances. Use
outside diameter micrometer to
measure the thickness, according
to the following formula
calculate the thickness of the new
valve lifters.

FE02-0289b

Intake: A=B+C-0.23 mm(0.01in)

Exhaust: A=B+C-0.32mm(0.13in)

10. Selected new valve lifters must be as close as possible to the calculated values. For

specifications. Refer to 2.6.1.3 Specification Table for Tappet Rods of Intake and Exhaust
Valves for the thickness of the tappet rod of valve.

11. Based on the measurement, according to 2.6.1.4 Selection Table for Tappet Rod of Exhaust

Valve, choose the tappet rod of valve to meet the specification.

12. Install intake and exhaust camshafts.

13. Install timing chain

14. Install the timing chain cover.

15. Install the ignition coil.

16. Install the plastic shield of engine.

A

Thickness of new valve lifter

B

Thickness of old valve lifter

C Measured

Valve

Clearance

509

2.6.8.21 Replacement of Crankshaft Rear Oil Seal

Dismantlement Procedure

1. Refer to 2.6.8.17 “Replacement

of Flywheel” to dismantle the
flywheel.

2. Dismantle the crankshaft rear oil

seal.

Note: Be careful not to damage the
crankshaft journal during
dismantlement.

GC02-0086c

Installation Procedure:

1. Use a special tool to install the

crankshaft rear oil seal.

2. Install the flywheel.

510

Была ли эта страница вам полезна?
Да!Нет
2 посетителя считают эту страницу полезной.
Большое спасибо!
Ваше мнение очень важно для нас.

Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.

Текст

Политика конфиденциальности