Geely Emgrand X7. Manual part — 301
Geely Emgrand X7. Manual part - 301
3.4.8.5 Disassembly and assembly of shift control mechanism
Dismantle procedure
1. Dismantle shift control mechanism assembly,
Refer to“3.4.8.4 shift control mechanism
replacement”.
2. Dismantle outer snap spring on the shift control
mechanism by snap soring pillar
FE03-0033b
3. Dismantle lock pin of shift control mechanism.
FE03-0034b
4. Take out shift lever sliding sleeve.
FE03-0035b
1203
5. Dismantle selecting control arm fastening bolt
FE03-0036b
6. Dismantle control arm oil seal of selecting rod as
shown in figure
FE03-0037b
7. Take out snap spring in the shift lever control
arm by snap spring pillar.
FE03-0038b
1204
8. Dismantle shift lever control arm oil
seal.completed shift control mechanism
disassembly.
FE03-0039b
Installation procedure::
1. Install control trailing arm oil seal of shift lever
Notes : Distance from oil seal end to oil seal hole is
0~0,5mm(0~19,685 in×10
-3
),
2. Install shift lever control lever .
0-0.5mm
FE03-0040b
3. Install inner snap spring .
FE03-0041b
1205
4. Install control level oil seal of selecting rod.
Distance from oil seal end to oil seal hole is 2.0~
2.5mm(78.740~98.425 in×10
-3
)。
2.0-2.5mm
FE03-0042b
5. Mount control arm of selecting lever, and tighten
bolt.
Notes:do not damaged seal lip
FE03-0043b
6. Install shift lever sliding sleeve .
FE03-0044b
1206
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст