Geely EC718, EC718RV, EC715, EC715RV. Manual part — 111
Geely EC718, EC718RV, EC715, EC715RV. Manual part - 111
GL301-020
FE02-0144b
7.
Use a special tool GL301-020 to install the crankshaft bolt.
Torque: 138 Nm (Metric) 102.2 lb-ft (US English)
FE02-0157b
8.
Install power steering pump.
9.
Install the engine mounting.
10. Install the water pump.
11. Install the generator.
12. Install the drive belt tensioner.
13. Install the drive belt.
14. Install the cylinder head cover.
15. Install the ignition coil.
16. Install the engine plastic shield.
17. Fill the engine coolant.
18. Connect the battery negative cable.
Engine
Engine Mechanical System JL4G18-D
2-359
2.6.8.10 Timing Chain Replacement
Removal Procedure:
FE02-0158b
1.
Rotate the crankshaft so that the cylinder No.1 is at TDC
position. Remove the timing chain cover. Refer to
the
Timing Chain Cover Replacement
FE02-0159b
2.
Remove the timing chain tensioner rail components
retaining bolts.
FE02-0160b
3.
Remove the timing chain tensioner rail component.
Note
Do not drop the tensioner device shoe during
removal, otherwise it is likely to cause damage to
the tensioner hoof block.
2-360
Engine Mechanical System JL4G18-D
Engine
FE02-0161b
4.
Remove the crankshaft sprocket Collar.
FE02-0162b
5.
Remove the timing chain guide rail lower retaining bolts.
FE02-0163b
6.
Remove the timing chain guide rail upper retaining bolt.
Engine
Engine Mechanical System JL4G18-D
2-361
FE02-0164b
7.
Remove the timing chain guide rail.
FE02-0165b
8.
Remove the timing chain and crankshaft sprocket.
Installation Procedure:
3
2
1
FE02-0166b
1.
Confirm the timing chain three yellow sections.
2-362
Engine Mechanical System JL4G18-D
Engine
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст