Geely EC718, EC718RV, EC715, EC715RV. Manual part — 345
Geely EC718, EC718RV, EC715, EC715RV. Manual part - 345
FE08-0033b
8.
Remove the left and right lower air-conditioning ventilation
pipes.
FE08-0034b
9.
Remove the air-conditioning assembly upper air duct.
Heating, Ventilation and A/C System
Automatic Air-conditioning
8-51
FE08-0035b
10. Remove the air-conditioning assembly retaining nuts.
FE08-0036b
11. Remove the air-conditioning evaporator side hard rubber
sleeve.
12. Remove the air-conditioning assembly.
8-52
Automatic Air-conditioning
Heating, Ventilation and A/C System
Installation Procedure:
FE08-0037b
1.
Install the air-conditioning assembly.
2.
Install the air-conditioning assembly retaining nuts and
bolts.
Torque:
Nut 10 Nm (Metric) 7.4 lb-ft (US English)
Bolt 6 Nm (Metric) 4.4 lb-ft (US English)
FE08-0038b
3.
Install the air-conditioning evaporator side hard rubber
sleeve.
4.
Install the air-conditioning assembly upper air duct.
Heating, Ventilation and A/C System
Automatic Air-conditioning
8-53
FE08-0039b
5.
Install the left and right lower air-conditioning ventilation
pipes.
FE08-0040b
6.
Connect the air-conditioning assembly harness
connector.
7.
Install the instrument panel retainers.
8.
Install the instrument panel.
9.
Install inlet/outlet warm air pipes, fastening the clamps.
10. Remove the heater core side warm air inlet and outlet
pipes and clamps
Torque: 8-10 Nm (Metric) 5.9-7.4 lb-ft (US English)
11. Fill the engine coolant.
12. Carry out the air-conditioning refrigerant filling process.
8.2.8.6 Expansion Valve Replacement
Removal Procedure
FE08-0020b
1.
Remove the air-conditioning assembly. Refer to
Air-conditioning Assembly Replacement
8-54
Automatic Air-conditioning
Heating, Ventilation and A/C System
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст