DAF CF65, CF75, CF85 Series . Manual — part 1067

©

200424

4-1

Removal and installation

HYDRAULIC LIFTING GEAR

ΧΦ65/75/85 series

8

9

4. REMOVAL AND INSTALLATION

4.1 REMOVAL AND INSTALLATION, PUMP UNIT

Before removing components, the

component concerned and the pipe

connections should be cleaned.

Working conditions should be very

clean as even the smallest impurity

can cause faults.

Removing the pump unit
1.

The wheels of the trailing axle must rest on

the ground.

2.

Remove the fuse from the lifting gear.

3.

Mark the engine-wiring connection points

and disconnect these.

4.

Mark the solenoid valve connectors and

disconnect these.

5.

Remove the hydraulic lines from the pump

unit.

Note: the pipe attached to pipe connection A

may retain a residual pressure.

Wait for approx. 5 minutes after the trailing

axle has been lowered before disconnecting

the hydraulic lines from the pump unit.

Collect the oil coming from the pipe.

Plug the openings.

6.

Remove the bolts (5). Remove the

support (1) and the attached pump unit (2).

7.

Remove the bracket (3).

8.

Remove the two attachment bolts (4) and lift

the pump unit from the support (1).

9.

If a new pump unit is to be installed, the

position of line connections (A) and (B)

should be marked.

}

B

A

A8 00 281

1

2

3

4

5

A8 00 287

HYDRAULIC LIFTING GEAR

4-2

©

200424

Removal and installation

9

ΧΦ65/75/85 series

8

Installing the pump unit
1.

If a new pump unit is to be installed, the line

connections should be transferred. Make

sure that the line connections are connected

to the correct pump outputs.

-

The line connection which is equipped

with M16 x 1.5 screw thread should be

fitted to output A.

-

The line connection which is equipped

with M18 x 1.5 screw thread should be

fitted to output B.

2.

Fit the pump unit on its support.

3.

Fit the bracket around the reservoir.

4.

Fit the support on its chassis cross member.

5.

Fit the pipes.

6.

Reconnect the wiring and put the fuse back

in.

7.

Fill the reservoir. See "Draining and filling".

8.

Inspect the line connections for leaks.

9.

Check the system pressure and the pressure

relief valve. See "Inspection and

adjustment".

B

A

A8 00 281

©

200424

4-3

Removal and installation

HYDRAULIC LIFTING GEAR

ΧΦ65/75/85 series

8

9

4.2 REMOVAL AND INSTALLATION, 4/2 SOLENOID VALVE

Removing the 4/2 solenoid valve
1.

Remove the connector.

2.

Clean the valve and the surrounding area.

Work cleanly.

3.

Remove the nut (1) at the valve top and take

the coil (4) from the valve.

4.

Remove the valve (6) from the valve block.

5.

The valve (6) itself cannot be disassembled.

Installing the 4/2 solenoid valve
1.

Renew the O-rings and the sealing ring.

2.

Apply a little oil to the valve (6) and install it

into the valve block. Tighten the valve to the

specified torque. See "Technical data".

3.

Check the O-rings (3) and (5) on the top and

bottom of the coil (4) and fit it.

4.

Turn the coil (4) into the desired position and

fit the spacer ring (2) with the nut (1).

5.

Fit the connector.

1
2
3

5

6

7
8
9

10

4

A8 00 252

HYDRAULIC LIFTING GEAR

4-4

©

200424

Removal and installation

9

ΧΦ65/75/85 series

8

4.3 CHECKING THE FLUID LEVEL IN THE HYDRAULIC LIFTING GEAR

1.

Make sure that the trailing axle wheels are

fully lowered and on the ground.

2.

Check the fluid level. The liquid level must be

between the "min." and "max." level mark. If

necessary, top up.

Была ли эта страница вам полезна?
Да!Нет
3 посетителя считают эту страницу полезной.
Большое спасибо!
Ваше мнение очень важно для нас.

Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.

Текст

Политика конфиденциальности