Mitsubishi Outlander XL. Manual — part 710
Pre-removal operation
⦆
Power Steering Fluid Draining (Refer to P.37-17.)
⦆
Steering Wheel Assembly and Air Bag Module Removal (Refer
⦆
Steering Shaft Cover Removal (Refer to P.37-23.)
⦆
Engine room Under Cover Front, Engine room Side Cover,
Engine room Under Cover Rear Removal (Refer to GROUP
51A - Under Cover Removal and Installation P.51A-18.)
⦆
Front Height Sensor Removal (Refer to GROUP 54Ac -
Chassis Electrical, Height Sensor Removal and Installation P.
⦆
Front Exhaust Pipe Removal (Refer to GROUP 15 - Exhaust
Pipe And Main Muffler Removal and Installation P.15-16.)
⦆
Front Roll Stopper And Centermember Assembly Removal
(Refer to GROUP 32 - Engine Roll Stopper and
Post-installation operation
⦆
Front Roll Stopper And Centermember Assembly Installation
(Refer to GROUP 32 - Engine Roll Stopper and
⦆
Front Exhaust Pipe Installation (Refer to GROUP 15 - Exhaust
Pipe And Main Muffler Removal and Installation P.15-16.)
⦆
Front Height Sensor Installation (Refer to GROUP 54Ac -
Chassis Electrical, Height Sensor Removal and Installation P.
⦆
Engine room Under Cover Front, Engine room Side Cover,
Engine room Under Cover Rear Installation (Refer to GROUP
51A - Under Cover Removal and Installation P.51A-18.)
⦆
Using your fingers, press the dust cover of each joint to check
for a crack or damage.
⦆
Steering Shaft Cover Installation (Refer to P.37-23.)
⦆
Steering Wheel Assembly and Air Bag Module Installation
⦆
Power Steering Fluid Refilling and Bleeding (Refer to P.
⦆
Steering wheel straight-ahead position check
⦆
Wheel Alignment Check and Adjustment (Refer to GROUP 33,
On-vehicle Service - Front Wheel Alignment Check and
ZC5019370000
6
10
9
5
4
2
3
13
*
11
12
12
14 <AWD>
7
1
N
17
N
*
N
N
11
N
14 <FWD>
15
18
16
8
5 ± 2 N·m
44 ± 17 in-lb
20 ± 5 N·m
15 ± 3 ft-lb
25 ± 5 N·m
19 ± 3 ft-lb
39 ± 6 N·m
29 ± 4 ft-lb
39 ± 6 N·m
29 ± 4 ft-lb
57 ± 7 N·m
42 ± 5 ft-lb
110 ± 11 N·m
82 ± 7 ft-lb
*
110 ± 11 N·m
82 ± 7 ft-lb
*
110 ± 11 N·m
82 ± 7 ft-lb
*
110 ± 11 N·m
82 ± 7 ft-lb
15 ± 3 N·m
11 ± 2 ft-lb
70 ± 10 N·m
52 ± 7 ft-lb
71 ± 11 N·m
53 ± 7 ft-lb
53 ± 8 N·m
39 ± 6 ft-lb
53 ± 8 N·m
39 ± 6 ft-lb
50 ± 5 N·m
37 ± 3 ft-lb
50 ± 5 N·m
37 ± 3 ft-lb
Removal steps
1.
Steering gear and joint connecting bolt
Removal steps
<<A>>
2.
Self-lock nut (Tie-rod end and knuckle
connection)
POWER STEERING
37-29
POWER STEERING GEAR BOX AND LINKAGE
Removal steps
3.
Self-lock nut (Lower arm and knuckle
connection)
4.
Stabilizer link
5.
Lower arm assembly
6.
Eye bolt
7.
Gasket
8.
Pressure hose connection
9.
Return hose connection
10. Return tube assembly
11. Flanged nut
Removal steps
12. Engine rear roll stopper bracket
connecting bolt
<<B>>
13. Front
axle
No.1
crossmember
assembly
14. Engine rear roll stopper
15. Heat protector
>>A<<
16. Joint cover grommet
17. Flanged bolt
18. Steering gear and linkage
REMOVAL SERVICE POINTS
<<A>> SELF-LOCK NUT (TIE-ROD END AND KNUCKLE
CONNECTION) REMOVAL
ZC5017940000
Cord
Bolt
MB991897
or
MB992011
Nut
Ball joint
⦆
Loosen the self-lock nut (tie-rod end and knuckle
connection) from the ball joint (Do not remove). Use the
special tool for the self-lock nut removal.
⦆
To prevent the special tool from dropping off, suspend it
with a rope.
1.
Install the ball joint remover (Special tool MB991897 or
MB992011) as shown in the figure.
ZC5017950000
Parallel
Knob
Bolt
Good
Bad
2.
Turn the bolt and knob to make the special tool jaws parallel,
then hand-tighten the bolt. After tightening, check that the jaws
are still parallel.
NOTE:
To adjust the special tool jaws to be parallel, set
the orientation of the knob as shown in the figure.
3.
Unscrew the bolt to disconnect the ball joint.
37-30
POWER STEERING
POWER STEERING GEAR BOX AND LINKAGE
<<B>> FRONT AXLE NO.1 CROSSMEMBER ASSEMBLY
REMOVAL
ZC501938
Transmission jack
Piece of wood
0000
1.
Jack up and support the crossmember, and remove it.
2.
Check the hoses and harnesses for roughness, and then
remove the front axle No.1 crossmember assembly with the
rear roll stopper and the steering gear and linkage installed.
INSTALLATION SERVICE POINTS
>>A<< JOINT COVER GROMMET INSTALLATION
ZC5019390000
Steering joint
cover assembly
Steering gear
Joint cover
grommet
Install the joint cover grommet to the steering gear and linkage
by aligning the mating marks as shown in the figure.
PINION TOTAL ROTATION TORQUE CHECK
M13702000901USA0000010000
ZC501940
MB991006
0000
Secure the steering gear & linkage to the special mounting
point. Fixing the steering gear & linkage to another point
could deform or damage the gear housing.
1.
Use the preload socket (Special tool: MB991006) to rotate the
pinion at a rate of one turn per 4 to 6 seconds, and then
measure the pinion total rotation torque.
Standard value:
Total rotation torque: 0.6 - 2.0 N·m (5.3 - 17.6 in-lb)
Torque fluctuation: 0.4 N·m (3.5 in-lb) or less
NOTE:
⦆
During measurement, remove the bellows from the gear
housing.
⦆
Rotate the pinion by 180° in left and right directions from the
neutral position, and measure the pinion total rotation
torque.
2.
If the measurement value is outside the standard value,
replace the gear housing.
POWER STEERING
37-31
POWER STEERING GEAR BOX AND LINKAGE
TIE-ROD OSCILLATING TORQUE CHECK
M13702000902USA0000010000
ZC5019740000
1.
Swing the tie-rod ten times strongly.
2.
Measure the oscillating resistance (oscillating torque) using a
spring scale as shown in the figure with the tie-rod end facing
downward.
Standard value: 5 - 16.3 N (44 - 80 in-lb) [1.5 - 4.9 N·m
(13.2 - 43.4 in-lb)]
3.
If the measurement is greater than the standard value, replace
the tie-rod.
4.
If the measurement value is below the standard value, check
the ball joint for looseness or scraping feeling. If the ball joint
swings smoothly, it is judged to be usable.
TIE-ROD END BALL JOINT DUST COVER CHECK
M13702000086USA0000010002
1.
Using your fingers, press the dust cover to check for a crack
or damage.
2.
If there are any cracks or damage in the dust cover, replace
the tie-rod end. (Refer to P.37-32.)
NOTE:
If the dust cover has a crack or damage, the ball
joint could be damaged.
DISASSEMBLY AND ASSEMBLY
M13702000111USA0000010000
ZC501975
Flare nut
5
4
6
7
8
3
1
2
0000
1
51 ± 2 N·m
37 ± 2 ft-lb
88 ± 10 N·m
65 ± 7 ft-lb
29 ± 5 N·m
21 ± 3 ft-lb
Disassembly steps
1.
Feed pipe
>>B<<
2.
Locking nut
>>B<<
3.
Tie-rod end
4.
Clip
>>A<<
5.
Band
Disassembly steps
6.
Bellows
7.
Tie-rod
8.
Gear housing
37-32
POWER STEERING
POWER STEERING GEAR BOX AND LINKAGE
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст