Dodge Caliber. Manual — part 1184
5.
Install the transmission crossmember and bolts,
(2) torque to 75 Nm (55 ft. lbs.).
6. Install the through bolt at the front transmission
mount (1) and torque to 75 Nm (55 ft. lbs.).
7. Insure that the O-ring (1)between the PTU and
transaxle is in place.
PM
POWER TRANSFER UNIT
21 - 35
8. Slide the PTU into place.
9. Install and torque PTU mounting bolts (1,2)to 58
N-m (43 lbf-ft).
10. Lower the hoist.
11. Install the maniverter (Refer to 11 - EXHAUST
SYSTEM/CATALYTIC
CONVERTER
-
INSTALLATION).
12. Install the air box (1).
13. Install engine trim cover.
14. Raise the vehicle on the hoist.
15. Install
the
exhaust
system
(Refer
to
11
-
EXHAUST
SYSTEM/MUFFLER
-
INSTALLA-
TION).
16. Install the Prop shaft (Refer to 3 - DIFFERENTIAL
& DRIVELINE/PROPELLER SHAFT - INSTALLA-
TION).
17. Install the axle shafts (Refer to 3 - DIFFEREN-
TIAL & DRIVELINE/HALF SHAFT - INSTALLA-
TION).
18. Fill PTU (Refer to 21 - TRANSMISSION/TRANS-
AXLE/POWER TRANSFER UNIT - STANDARD
PROCEDURE).
19. lower hoist.
20. Connect battery cables (2).
21. Top off the fluids (Refer to 21 - TRANSMISSION/
TRANSAXLE/POWER TRANSFER UNIT - STAN-
DARD PROCEDURE).
21 - 36
POWER TRANSFER UNIT
PM
SPECIFICATIONS -
TORQUE SPECIFICATIONS
DESCRIPTION
N·m
Ft. Lbs.
In. Lbs.
Plug, Fill
32
24
-
Plug, Drain
32
24
-
Bolts, Inspection cover
23
17
-
Bolts, Vent Shield
23
17
-
Bolts, Vent
23
17
-
Bolts, Output Shaft
Housing
38
28
-
Bolts, extension housing
38
28
-
Nut, Output Shaft
150
111
-
Bolts, Carrier Assembly
Side Cover
23
17
-
Bolts, Ring Gear
74
55
-
Bolt and Nut, Rear Mount
Through
75
55
-
Bolts, Transmission
Crossmember
75
55
-
Bolt and Nut,
Transmission
Crossmember through
75
55
-
Bolts, PTU Mounting
58
43
-
PM
POWER TRANSFER UNIT
21 - 37
SPECIAL TOOLS
INSTALLER 9714
INSTALLER 9715
SPLINE SOCKET 9743
INSTALLER 9851
INSTALLER 9852
INSTALLER 9853
INSTALLER 9855
O2S (Oxygen Sensor) Remover/Installer - 8439
21 - 38
POWER TRANSFER UNIT
PM
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст