SsangYong Rexton. Manual — part 347
M161 ENGINE MECHANICAL 1B2-71
SSANGYONG Y200
YAD1B2D0
YAD1B2E0
YAD1B2F0
YAD1B2E0
12. Place the outer plate (7, thickness 1.2 mm) inside
the thrust piece (b).
16. Install the chain assembly 000 589 58 43 00 to
the link pin and tighten the spindle (c).
Installation Notice
15. Replace the thrust piece (b) as shown in the figure.
13. Install the chain assembly 000 589 58 43 00 above
the link and tighten the spindle (c) until a block is
felt.
14. Place the chain assembly 000 589 58 43 00.
Tightening Torque
30 N•m (22 lb-ft)
SSANGYONG Y200
1B2-72 M161 ENGINE MECHANICAL
YAD1B2G0
17. Rivet the link pin.
Check the condition and it again if necessary.
18. Install the chain tensioner.
Installation Notice
19. Check the camshaft timing position.
Tightening
Torque
Screw Plug
Tensioner
Assembly
40 N•m
(30 lb-ft)
72 - 88 N•m
(53 - 65 lb-ft)
M161 ENGINE MECHANICAL 1B2-73
SSANGYONG Y200
TENSIONING RAIL
Preceding Work:
Removal of cylinder head
1 Sliding Rail Pin
2 Sliding Rail
Removal & Installation Procedure
1. Remove the timing gear case cover (3).
Notice: Be careful not to damage the gasket.
2. Remove the sliding rail (1) from the sliding rail
pin (2).
Notice:
•
Replace the plastic guide (2) if it is damaged.
•
For installation, exactly align the plastic guide
(2) with the sliding rail (1).
3. Installation should follow the removal procedure
in the reverse order.
YAD1B7K0
3 Timing Gear Case Cover
SSANGYONG Y200
1B2-74 M161 ENGINE MECHANICAL
YAD1B7L0
CYLINDER HEAD GUIDE RAIL
Preceding Work: Removal of cylinder head front cover
1 Bolt (M6 X 45, 2 pieces)
. . . . . . . . . 9 - 11 N•m (80 - 97 lb-in)
2 Guide Rail
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст