Isuzu KB P190. Manual — part 20
1-46 HEATER AND AIR CONDITIONING
Important Operations - Installation
7. Bolt; Compressor to Bracket
N
⋅m (kgf⋅m/lb⋅ft)
Torque
44 (4.5/33)
6. Refrigerant Line
N
⋅m (kgf⋅m/lb⋅in)
Torque 11
∼19 (1.1/95∼1.9/168)
5. Drive Belt
Refer to SECTION 6A “COOLING SYSTEM”.
HEATER AND AIR CONDITIONING 1-47
REMOVAL AND INSTALLATION (4JJ1-TC Standard Output, 4JJ1-TC High Output, 4JK1-TC High Output)
RTW510MF000201
Removal Steps
1. Magnetic clutch harness connector
2. Drive belt
3. Refrigerant line
4. Bolt; compressor to bracket
5. Compressor assembly
Installation Steps
5. Compressor assembly
▲ 4. Bolt; compressor to bracket
▲ 3. Refrigerant line
▲ 2. Drive belt
1. Magnetic clutch harness connector
1-48 HEATER AND AIR CONDITIONING
Important Operations - Installation
4. Bolt; Compressor to Bracket
N
⋅m (kgf⋅m/lb⋅ft)
Torque
44 (4.5/33)
3. Refrigerant Line
N
⋅m (kgf⋅m/lb⋅in)
Torque 11
∼19 (1.1/95∼1.9/168)
2. Drive Belt
Refer to SECTION 6A “INTAKE MANIFOLD”.
HEATER AND AIR CONDITIONING 1-49
REMOVAL AND INSTALLATION (C24SE)
RTW310MF000401
Removal Steps
1. Magnetic clutch harness connector
2. Drive belt
3. Refrigerant line
4. Bolt; compressor to bracket
5. Compressor assembly
Installation Steps
5. Compressor assembly
4. Bolt; compressor to bracket
3. Refrigerant line
2. Drive belt
1. Magnetic clutch harness connector
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст