Isuzu KB P190. Manual — part 20

1-46 HEATER AND AIR CONDITIONING

Important Operations - Installation


7. Bolt; Compressor to Bracket

N

⋅m (kgf⋅m/lb⋅ft)

Torque

44 (4.5/33)


6. Refrigerant Line

N

⋅m (kgf⋅m/lb⋅in)

Torque 11

∼19 (1.1/95∼1.9/168)


5. Drive Belt

Refer to SECTION 6A “COOLING SYSTEM”.


HEATER AND AIR CONDITIONING 1-47

REMOVAL AND INSTALLATION (4JJ1-TC Standard Output, 4JJ1-TC High Output, 4JK1-TC High Output)

RTW510MF000201

Removal Steps

1. Magnetic clutch harness connector

2. Drive belt

3. Refrigerant line

4. Bolt; compressor to bracket

5. Compressor assembly

Installation Steps

5. Compressor assembly

▲ 4. Bolt; compressor to bracket
▲ 3. Refrigerant line
▲ 2. Drive belt

1. Magnetic clutch harness connector

1-48 HEATER AND AIR CONDITIONING

Important Operations - Installation


4. Bolt; Compressor to Bracket

N

⋅m (kgf⋅m/lb⋅ft)

Torque

44 (4.5/33)


3. Refrigerant Line

N

⋅m (kgf⋅m/lb⋅in)

Torque 11

∼19 (1.1/95∼1.9/168)

2. Drive Belt

Refer to SECTION 6A “INTAKE MANIFOLD”.

HEATER AND AIR CONDITIONING 1-49

REMOVAL AND INSTALLATION (C24SE)

RTW310MF000401

Removal Steps

1. Magnetic clutch harness connector

2. Drive belt

3. Refrigerant line

4. Bolt; compressor to bracket

5. Compressor assembly

Installation Steps

5. Compressor assembly

4. Bolt; compressor to bracket

3. Refrigerant line

2. Drive belt

1. Magnetic clutch harness connector

Была ли эта страница вам полезна?
Да!Нет
7 посетителей считают эту страницу полезной.
Большое спасибо!
Ваше мнение очень важно для нас.

Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.

Текст

Политика конфиденциальности