Isuzu KB P190. Manual — part 19
1-42 HEATER AND AIR CONDITIONING
REMOVAL AND INSTALLATION (C24SE)
This illustration is based on RHD model
RTW710LF004101
Removal Steps
1. Radiator grille
2. Engine hood lock
3. Engine hood front end stay
4. Triple pressure switch connector
5. Condenser fan connector
6. Refrigerant line
7. Refrigerant line
8. Receiver/drier bracket
9.
Receiver/drier
10. Condenser assembly
Installation Steps
10. Condenser assembly
9.
Receiver/drier
8. Receiver/drier bracket
7. Refrigerant line
6. Refrigerant line
5. Condenser fan connector
4. Pressure switch connector
3. Engine hood front end stay
2. Engine hood lock
1. Radiator grille
HEATER AND AIR CONDITIONING 1-43
CONDENSER FAN MOTOR
REMOVAL AND INSTALLATION
RTW710MF000701
Removal Steps
1. Radiator grille
2. Fan connector
3. Condenser fan motor
Installation Steps
3. Condenser fan motor
2. Fan connector
1. Radiator grille
1-44 HEATER AND AIR CONDITIONING
RECEIVER / DRIER
REMOVAL AND INSTALLATION
RTW710LF000801
Removal Steps
1. Radiator grille
2. Pressure switch connector
3. Refrigerant line
4. Bracket bolt
5.
Receiver/drier
Installation Steps
5. Receiver/drier
4. Bracket bolt
3. Refrigerant line
2. Pressure switch connector
1. Radiator grille
HEATER AND AIR CONDITIONING 1-45
COMPRESSOR
REMOVAL AND INSTALLATION (4JA1-T, 4JH1-TC)
852R300006
Removal Steps
1. Air duct
2. Magnetic clutch harness connector
3. Lock nut
4. Tension adjustment bolt
5. Drive belt
6. Refrigerant line
7. Bolt; compressor to bracket
8. Compressor assembly
Installation Steps
8. Compressor assembly
7. Bolt; compressor to bracket
6. Refrigerant line
5. Drive belt
4. Tension adjustment bolt
3. Lock nut
2. Magnetic clutch harness connector
1. Air duct
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст