INSTALL AUTOMATIC TRANSMISSION ASSEMBLY
a
for 2WD:
Refer to the following procedures (see INSTALLATION )
b
for 4WD:
Refer to the following procedures (see INSTALLATION )
8
INSTALL STARTER ASSEMBLY (See INSTALLATION )
9
INSTALL STARTER COVER (See INSTALLATION )
10
INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY RH (See INSTALLATION )
11
INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR (See INSTALLATION )
12
INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE (See INSTALLATION )
13
INSTALL FRONT FENDER APRON SEAL REAR RH (See INSTALLATION )
14
INSTALL FRONT FENDER APRON SEAL RH (See INSTALLATION )
15
INSTALL FRONT PROPELLER SHAFT ASSEMBLY (for 4WD)
a
Install the front propeller shaft (see INSTALLATION )
16
INSTALL PROPELLER SHAFT ASSEMBLY
a
for 2WD:
Refer to the following procedures (see INSTALLATION )
b
for 4WD:
Refer to the following procedures (see INSTALLATION )
17
INSTALL EXHAUST PIPE ASSEMBLY
a
for Regular Cab Standard Deck:
Refer to the following procedures (see INSTALLATION )
b
except Regular Cab Standard Deck:
Refer to the following procedures (see INSTALLATION )
18
INSTALL GENERATOR ASSEMBLY (See INSTALLATION )
19
CONNECT VANE PUMP ASSEMBLY (See INSTALLATION )
20
CONNECT COOLER COMPRESSOR ASSEMBLY (See INSTALLATION )
21
CONNECT WIRE HARNESS AND HOSE
a
Connect the 2 connectors and 2 clips to the engine room junction block
b
Install the engine wire with the nut Then connect the 2 clips
2009 Toyota Tundra
2009 ENGINE Engine Mechanical (3UR-FE) - Tundra
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
c
Connect the 4 air injection control driver connectors
Fig. 207: Locating Air Injection Control Driver Connectors
2009 Toyota Tundra
2009 ENGINE Engine Mechanical (3UR-FE) - Tundra
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
d
Install the ground wire with the bolt
Torque: 8.0 N*m (82 kgf*cm, 71 in.*lbf)
e
Connect the cable to the positive (+) battery terminal
f
Install the wire to the positive (+) battery cable with the nut
Torque: 13 N*m (133 kgf*cm, 10 ft.*lbf)
g
Connect the 2 air injection system hoses
h
Install the ground wire with the bolt
Torque: 8.0 N*m (82 kgf*cm, 71 in.*lbf)
i
Connect the 2 air pump connectors and install the connector bracket with the nut
Torque: 6.0 N*m (61 kgf*cm, 53 in.*lbf)
Fig. 208: Locating Air Pump Connectors
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
j
Connect the 4 connectors to the connector holder block
Fig. 209: Locating Connector Holder Block Connectors
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
2009 Toyota Tundra
2009 ENGINE Engine Mechanical (3UR-FE) - Tundra
k
Connect the heater hoses
l
Connect the ECM connector and clamp
HINT:
Refer to the following procedures to connect the ECM connector (see ACIS CONTROL
CIRCUIT )
Fig. 210: Locating Clamp And ECM Connector
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
m
Connect the union to check valve hose
n
Connect the purge line hose
Fig. 211: Locating Purge Line Hose
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
22
CONNECT FUEL MAIN AND RETURN HOSE
a
Connect the fuel main and return hoses (see FUEL SYSTEM )