Toyota Tundra. Manual — part 2039

b

Install the oil pan with the 14 bolts and 2 nuts

Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)

Fig. 339: Identifying Seal Packing Areas On No. 2 Oil Pan Sub-Assembly
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.

2009 Toyota Tundra

2009 ENGINE Engine Mechanical (3UR-FE) - Tundra

Fig. 340: Locating No. 2 Oil Pan Sub-Assembly Bolts And Nuts
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.

NOTE:

Do not start the engine for at least 2 hours after installing.

2009 Toyota Tundra

2009 ENGINE Engine Mechanical (3UR-FE) - Tundra

10

INSTALL NO. 1 HEAT EXCHANGER COVER

a

Apply seal packing in a continuous line as shown in the illustration

Seal packing: Toyota Genuine Seal Packing 1282B, Three Bond 1282B or equivalent

Standard seal diameter: 3.0 to 4.0 mm (0.118 to 0.157 in.)

NOTE:

Remove any oil from the contact surface.

Install the No. 1 heat exchanger cover within 3 minutes and
tighten the bolts and nuts within 15 minutes after applying seal
packing.

2009 Toyota Tundra

2009 ENGINE Engine Mechanical (3UR-FE) - Tundra

b

Install the heat exchanger cover with the 12 bolts and 2 nuts

Fig. 341: Identifying Seal Packing Areas On No. 1 Heat
Exchanger Cover
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.

2009 Toyota Tundra

2009 ENGINE Engine Mechanical (3UR-FE) - Tundra

Была ли эта страница вам полезна?
Да!Нет
9 посетителей считают эту страницу полезной.
Большое спасибо!
Ваше мнение очень важно для нас.

Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.

Текст

Политика конфиденциальности