Geely Emgrand X7. Manual part — 666
Geely Emgrand X7. Manual part - 666
2. Fix wire harness of rear horizontal beam.
3. Install the rear bumper.
NL12-0066b
2663
12.5 Door
12.5.1 Specification
12.5.1.1 Fastener specifications
Torque Range
Fastener Name
Model
Metric (NM)
English system (lb-ft)
Fixing Bolts of Left Front Door
Assembly
M8X30
33 - 38
24.4 - 28.1
Fixing Bolts of Right Front Door
Assembly
M8X30
33 - 38
24.4 - 28.1
Fixing bolt of left rear door
assembly
M8X30
33 - 38
24.4 - 28.1
Fixing Bolts of Right Rear Door
Assembly
M8X30
33 - 38
24.4 - 28.1
Door lock catch
M8×22
18 - 22
13.3 - 16.3
Fixing Bolts of Door Lock
M8X30
33 - 38
24.4 - 28.1
Door stopper assembly
M8×20
22 - 26
16.3 - 19.2
2664
12.5.2 Dismantle and install
12.5.2.1 Door and hinge replacement
NL12-0088b
1
NL12-0087b
Dismantlement Procedure
Warning!
Warning: Refer to "Warning on Battery
Disconnection" in "Warnings and Precautions".
1. Disconnect the battery negative cable. Refer to
2.11.8.1 Battery Cable Disconnection/Connection
Procedures.
2. For dismantling of front fender, refer to
12.2.3.4
Replacement of front fender.
3. Loosen door electric appliance wire harness
dustproof cover, and disconnect wire harness
connector 1.
4. For dismantling of door limit stopper, refer to
12.5.2.2 Replacement of door limit stopper.
5. Clean the assembly surface of the door hinge
with cleaning cloth and mark the position of the
hinge on the surface of the door using an oil pen
or other marking tools.
6. Remove the body side fixing bolts for the upper
and lower hinges.
7. Dismantle the door.
8. Clean the side body hinge assembly surface with
cleaning cloth and mark the position of the hinge
on the body surface with an oil pen or other
marking tools.
9. Remove the fixing bolts for the upper and lower
hinges on the door side.
10. Dismantle upper, lower hinges.
Installation Procedure:
1. Install the hinge on the door and install the door
with preloaded hinge on the body. After the fine
tuning, tighten the door to the specified torque.
Torque :24Nm(Metric) 17 . 8lb-ft(English system)
Notes:
See "Special Cautions Regarding Fastening Parts" in
"Warnings and Cautions".
NL12-0089b
2665
2. Install
door.
3. Connect door wire harness connector, and install
it into the vehicle body, and then install dustproof
cover.
4. Install door limit stopper.
5. Close the door to see whether the door clearance
is proper. If necessary, please adjust the
clearance.
6. Tighten the fixing bolts of door.
Torque: 36Nm (Metric) 26. 7lb-ft(English system)
7. Install the fender.
8. Install the front fender liner.
9 . Connect the battery negative cable.
NL12-0090b
2666
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст