Geely EC718, EC718RV, EC715, EC715RV. Manual part — 106
Geely EC718, EC718RV, EC715, EC715RV. Manual part - 106
FE02-0098b
8.
Remove throttle body preheated water outlet pipe.
Warning!
When the engine temperature is high, prevent the
engine coolant spray, causing burns in the removal
procedure.
FE02-0104b
9.
Remove throttle body retaining nut from the intake
manifold.
FE02-0101b
10. Remove throttle body bracket bolts.
Engine
Engine Mechanical System JL4G18-D
2-339
FE02-0102b
11. Remove the throttle body assembly from the intake
manifold and complete the removal procedure.
Installation Procedure:
FE02-0103b
1.
Clean the engine throttle body and the engine intake
manifold mating surface and replace the seals.
FE02-0104b
2.
Install the throttle body to the intake manifold and tighten
the retaining nut.
2-340
Engine Mechanical System JL4G18-D
Engine
FE02-0105b
3.
Install throttle body bracket and tighten the bolts.
FE02-0106b
4.
Install the throttle preheated water inlet pipe.
FE02-0107b
5.
Install the throttle preheated water outlet pipe.
Engine
Engine Mechanical System JL4G18-D
2-341
FE02-0109b
6.
Install the crankcase ventilation hose.
FE02-0110b
7.
Connect the throttle position sensor wiring harness
connector.
FE02-0111b
8.
Connect the idle speed control valve wiring harness
connector.
2-342
Engine Mechanical System JL4G18-D
Engine
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст