Mitsubishi Eclipse. Manual — part 713
ENGINE ROLL STOPPER AND CENTERMEMBER
TSB Revision
POWER PLANT MOUNT
32-9
INSTALLATION SERVICE POINT
.
>>A<< FRONT ROLL STOPPER INSTALLATION
Install so that the hole in the front roll stopper is facing towards
the front of the vehicle.
FRONT ROLL STOPPER,
CENTERMEMBER REMOVAL
STEPS
1.
TRANSAXLE AND FRONT ROLL
STOPPER CONNECTING BOLT
2.
CENTERMEMBER MOUNTING
BOLTS
3.
STOPPER
4.
CENTERMEMBER
>>A<<
5.
FRONT ROLL STOPPER
6.
COLLAR
7.
BUSHING (LOWER)
8.
BUSHING (UPPER)
REAR ROLL STOPPER
REMOVAL STEPS
9.
TRANSAXLE AND REAR ROLL
STOPPER CONNECTING BOLT
10. REAR ROLL STOPPER
FRONT ROLL STOPPER,
CENTERMEMBER REMOVAL
STEPS (Continued)
AC000304 AB
FRONT OF VEHICLE
HOLE
CROSSMEMBER
TSB Revision
POWER PLANT MOUNT
32-10
CROSSMEMBER
REMOVAL AND INSTALLATION
M1321003200186
CAUTION
•
*
: Indicates parts which should be temporarily tightened, and then fully tightened with the vehicle
on the ground in the unladen condition.
• For vehicles with SRS, before removal of steering gear box, refer to GROUP 52B, center the front
wheels and remove the ignition key. Failure to do so may damage the SRS clock spring and render
the SRS system inoperative, risking serious injury.
Pre-removal Operation
• Power Steering Fluid Draining (Refer to GROUP 37A,
On-vehicle Service
− Fluid Replacement
• Centermember Removal (Refer to
.)
• Front Exhaust Pipe Removal (Refer to GROUP 15,
Exhaust pipe and Main Muffler
<2.4L Engine>,
<3.0L Engine>.)
• Stabilizer Bar Removal (Refer to GROUP 33A, Stabilizer
Bar
• Rear Roll Stopper Removal (Refer to
.)
Post-installation Operation
• Rear Roll Stopper Installation (Refer to
.)
• Stabilizer Bar Installation (Refer to GROUP 33A, Stabilizer
• Front Exhaust Pipe Installation (Refer to GROUP 15,
Exhaust Pipe and Main Muffler
<2.4L Engine>,
<3.0L Engine>.)
• Centermember Installation (Refer to
.)
• Power Steering Fluid Supplying and Bleeding (Refer to
GROUP 37A, On-vehicle Service
− Fluid Replacement
• Steering Wheel Straight Ahead Position Checking.)
• Wheel Alignment Check and Adjustment (Refer to
GROUP 33A, On-vehicle Service
− Front Wheel Align-
ment Check and Adjustment
AC005142
6
7
8
9
10
4
11
5
4
2
1
108 ± 10 N·m
80 ± 7 ft-lb
108 ± 10 N·m*
80 ± 7 ft-lb*
88 ± 10 N·m
65 ± 7 ft-lb
74 ± 4 N·m
55 ± 3 ft-lb
81 ± 12 N·m
60 ± 9 ft-lb
AB
3
CROSSMEMBER
TSB Revision
POWER PLANT MOUNT
32-11
CROSSMEMBER BUSHING REPLACEMENT
M1321000900119
Required Special Tools:
• MB990828: Bushing Remover and Installer
• MB991045: Bushing Remover and Installer
Crossmember Bushings A and B
1. Apply soapy water to the contact surface of the bushing
when press-fitted the bushing.
2. The bushing should be press-fitted so that the inner pipe
projection is at the standard length.
Standard values
• <2.4L ENGINE>
• Bushing A: 9.0 ± 1.0 mm (0.35 ± 0.04 inch)
• Bushing B: 4.0 ± 1.0 mm (0.16 ± 0.04 inch)
• <3.0L ENGINE>
• Bushing A, B: 9.0 ± 1.0 mm (0.35 ± 0.04 inch)
REMOVAL STEPS
1.
STAY <2.4L ENGINE>
2.
LOWER ARM AND
CROSSMEMBER
CONNECTION
3.
LOWER ARM MOUNT BOLT
•
POWER STEERING GEAR BOX
(REFER TO GROUP 37A,
POWER STEERING GEAR BOX
4.
CROSSMEMBER MOUNTING
NUT
5.
LOWER PLATE
6.
CROSSMEMBER
7.
STOPPER A
8.
STOPPER B
9.
BUSHING C
10. BUSHING A
11. BUSHING B
REMOVAL STEPS (Continued)
AC000306
REMOVAL
PRESS-FITTING
BOLT
WASHER
NUT
BASE
BASE
NUT
WASHER
BOLT
MB991045
AB
AC000307AB
<2.4L ENGINE>
BUSHING A
BUSHING B
INNER PIPE
INNER PIPE
AC000308
INNER PIPE
INNER PIPE
BUSHING A
BUSHING B
<3.0L ENGINE>
AB
CROSSMEMBER
TSB Revision
POWER PLANT MOUNT
32-12
Crossmember Bushing C
1. Use special tool MB990828 to drive out and press-fit the
crossmember bushing C.
2. The bushing should be press-fitted so that the inner pipe
projection is at the standard length.
Standard value (A): 4.0
± 0.5 mm (0.16 ± 0.02 inch)
AC000309AB
REMOVAL
PRESS-FITTING
MB990828
AC000310
INNER PIPE
A