Dodge Ram Truck 1500-2500-3500. Manual — part 72
8. Install flange (1) with U-joint in yoke (2).
9. Position press (2) with receiver (1) and lower bear-
ing cap (3) on yoke.
10. Press bearing cap until snap ring groove is
through the yoke.
3 - 120
PROPELLER SHAFT
DR/DH
11. Install snap ring (2) on bearing cap (1).
12. Position press (2) with receiver (3) on remaining
bearing cap (1) and yoke.
13. Press remaining bearing cap until snap ring
groove is through the yoke.
DR/DH
PROPELLER SHAFT
3 - 121
14. Install snap ring (2) on bearing cap (1).
ASSEMBLY - WITH SNAP RINGS
1. Apply (EP) N.L.G.I. Grade 1 or 2 grease to inside
of yoke bores.
2. Position cross (1) in yoke with lube fitting pointing
up, if equipped.
3 - 122
PROPELLER SHAFT
DR/DH
3. Place a bearing cap (1) over the cross end (2) and
align cap with yoke bore.
4. Press bearing cap into the yoke bore enough to
clear snap ring groove.
5. Repeat Step 3 and Step 4 to install the opposite
bearing cap.
NOTE: If joint is stiff or binding, strike the yoke
with a soft hammer to seat the needle bearings.
6. Add grease to lube fitting, if equipped.
7. Install propeller shaft.
UNIVERSAL JOINTS-DOUBLE CARDAN
DISASSEMBLY
1. Remove propeller shaft.
2. Mark propeller shaft, link yoke and flange yoke for
assembly reference.
3. Tap outside of the bearing cap assembly with drift
to loosen snap rings.
4. Remove all bearing cap snap rings.
5. Remove grease fittings if equipped.
6. Position a socket on the press with an inside diam-
eter large enough to receive the bearing cap under
the link yoke.
7. Place another socket with an outside diameter
smaller than the bearing cap on the upper bearing
cap.
DR/DH
PROPELLER SHAFT
3 - 123
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст