Geely Emgrand X7. Manual part — 249
Geely Emgrand X7. Manual part - 249
4. Take out crankshaft chain wheel
retaining ring.
FE02-0161b
5. Remove the lower fixing bolt for
the timing chain guide rail.
FE02-0162b
6. Remove the upper fixing bolt for
the timing chain guide rail.
FE02-0163b
995
7. Dismantle the timing chain guide
rail.
FE02-0164b
8. Dismantle the timing chain and
crankshaft chain wheel.
FE02-0165b
Installation Procedure:
1. Make sure there is 3 yellow chain
links on timing chain.
3
2
1
FE02-0166b
996
2. Install timing chain and
crankshaft chain wheel. The first
yellow chain link points to timing
mark of positive crankshaft chain
wheel.
Note: there are three yellow chain
links on the timing chain, wherein
two yellow chain links (with 6 links
therebetween) are aligned with the
timing mark of the intake and
exhaust camshaft chain!
FE02-0167b
3. Align the second yellow chain
link on chain with timing mark of
air intake cam VVT actuator
chain wheel.
FE02-0168b
4. Align the 3rd yellow chain link
of the the chain with timing mark
of air exhaust chain wheel.
FE02-0169b
997
5. Install the timing chain guide rail
components.
FE02-0170b
6. Install the fixing bolts for the
timing chain guide rail
components.
Tightening torque: 10N.m (Metric)
7.4lb-ft (Inch)
FE02-0171b
7. Install tensioning guide rail
component
FE02-0172b
998
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст